Laserfiche WebLink
SWR'CB, January 2002 0 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill. Containment Boxes ❑ <br />Page -a— of <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: 0 Spill Bucket Manufactu ❑ Industry Standard <br />❑ Other (Specify) <br />❑ Professional Engineer <br />Test od Used: <br />0 Pressure ❑ Vacuum <br />❑ Other (Sped) <br />❑ Hydrostatic <br />Test Equipment Use - <br />Bucket Diameter: <br />Equipment Resoluti - <br />ill Box # Spill Box # Spi ox # Spill Box # <br />Bucket Depth: <br />/ <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />ti <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />.✓' <br />°� <br />Final Reading (RF): <br />Test Duration: <br />Change in Re mg (RF -RI): <br />Pass eshold or <br />C.. .a: <br />est Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail. <br />Color ents —(include information on repairs made prior to testing, and recommended follow-up fo�r failed t ts) <br />b tae / ift �e s <br />,4 ed a m u eet` C 4t 1-141ni � t� . f <br />�.a <br />$ C, e*' e' ..� C 4 /evi <br />