My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:47:40 PM
Creation date
6/23/2020 6:59:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\15237\PR0517272\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Catanyag that he would be contacted once a date and time has been scheduled. <br /> On May 11, 2005, Mr. Catanyag e-mailed Mr. Baker a summary of their discussion regarding <br /> the requested documentation and testing requirements(Attachment 9). <br /> On May 12, 2005, Mr. Catanyag received a copy of the D.O. inspection reports for the <br /> months of January 2005 to May 2005 (Attachment 10). On this day, Mr. Catanyag also received a <br /> call from Mr. Callahan stating that NTCA has not acted fast enough to schedule the necessary tests <br /> and that Flying J will hire the testing company. Mr. Catanyag is to be notified of an exact date and <br /> time of testing. <br /> On May 13, 2005, Mr. Catanyag received a call from Mr. Rusty Mace, Regional Project <br /> Manager for Flying J. Mr. Mace stated the tests have been scheduled on May 25 and 26, 2005 at 8:00 <br /> am. The tests are to be conducted by TAIT Environmental. Mr. Mace stated that Ms. Clements would <br /> fax a written notification. <br /> On May 25 and 26, 2005, TAIT Environmental conducted secondary containment testing and <br /> monitoring certification. <br /> On May 26, 2005, a routine inspection was conducted by Mr. Catanyag. Speaking with the <br /> technician, there were several failures in the secondary containment testing. According to the <br /> technician, the failures were due mostly to the technician's inability to get access to test boots. Without <br /> access, there is no way for the technician to tighten the boots for proper testing. A non-functional <br /> under dispenser pan sensor and two failed spill buckets were noted in the inspection report. Upon <br /> reviewing the inspection report with the Mr. Baker, Elite IV has already been contacted to come out on <br /> May 27, 2005 to replace the sensor and clean out the drain valve. A permit is to be submitted by Elite <br /> IV. <br /> On May 31, 2005, a permit application (Attachment 12) to replace the sensor was received by <br /> EHD. According to the Elite IV technician, the drain valve was cleaned. The spill bucket was retested <br /> and passed. Mr. Catanyag tested the new sensor and found it to be functional. The spill buckets were <br /> also tested and passed. <br /> ftanan Facile <br /> On March 8, 2005, secondary containment testing was performed. Results submitted to EHD <br /> indicated there were five components that failed(Attachment 14). <br /> On March 22, 2005, Mr. Ray von Flue spoke with Denise from Dialysis North (testing <br /> company) and told her that using a split boot as a method of repair is not approved unless the item has <br /> been third party tested and approved. <br /> On July 28, 2005, Mr. Catanyag received an e-mail from Dan Crawford (Attachment 13) <br /> specifying the actions taken by Flying J in order to make the necessary repairs. According to the <br /> document, Flying J is having difficulty in finding a company that will make the repairs at a particular <br /> cost. <br /> On August 15, 2005, Mr. Catanyag spoke with Mr. Callahan. Mr. Catanyag wanted to remind <br /> Mr. Callahan that the secondary containment testing revealed several failures and repairs have not <br /> occurred.- It was also mentioned that it has been greater than-120 days since the,test was performed. <br /> Mr. Callahan said he was fully aware of the fact and will contact Mr. Crawford to get it scheduled as <br /> soon as possible. However, Mr. Callahan stated that Flying J is having difficulty in finding a company <br /> that is willing to make such repairs, "because they are all so busy." <br /> On September 13, 2005, Mr. Catanyag confirmed the functionality of the 91-SUL leak detector <br /> that had failed on August 2,2005. The work was done under a permit approved on August 10, 2005. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.