Laserfiche WebLink
� • <br /> pressurized piping with secondary containment at least annually at a pressure designated by the <br /> equipment manufacturer, provided that the method is capable of detecting a minimum release <br /> equivalent to 0.1 gallon per hour defined at 150 percent of the normal operating pressure of the <br /> product piping system at the test pressure with at least a 95 percent probability of detection and not <br /> more than a 5 percent probability of false alarm. <br /> Line tightness test was not performed. <br /> CCR 2638(a)—Annual certification of monitoring equipment. All monitoring equipment used to <br /> satisfy the requirement of this article shall be installed, calibrated, operated and maintained in <br /> accordance with manufacturer's instructions, and certified every 12 months for operability, proper <br /> operating condition, and proper calibration. <br /> There was no monitoring certification performed in 2003 or 2005. It has been scheduled <br /> for May 26, 2005. <br /> CCR 2662 — Requirements for upgrading UST. Before upgrading an underground storage tank <br /> system, the owner or operator shall demonstrate to the satisfaction of the local agency that the <br /> conditions and requirements specified in subsection 2660(k)will be met. <br /> The 87-RUL and 91-SUL spill containers were replaced in 2002 (exact date unknown) <br /> without notification to the department. Inspections were not done at the time of the <br /> retrofit but inspections have been made since. <br /> V_ ADDITIONAL. ATTACHMENTS <br /> A copy of the file will be sent to the District Attorney's office upon completion of duplication. <br /> Attachment 1 (Notice to abate—March 9,2004) <br /> Attachment 2 (Permit application to install overfill prevention—March 9,2004) <br /> Attachment 3 (Inspection report with pictures—March 26,2004) <br /> Attachment 4(Invoice from Elite IV regarding UDC clean-up—March 26,2004) <br /> Attachment 5 (Permit application to install spill buckets—March 26,2004) <br /> Attachment 6 (Letter of contradiction to SJAPCD—EHD received on May 6,2004) <br /> Attachment 7 (Letter to facility to schedule testing—April 6,2005) <br /> Attachment 8 (Copy of the D.O. notification form—December 31,2004) <br /> Attachment 9(E-mail to facility regarding site visit—May 11,2005) <br /> Attachment 10(Copy of D.O. inspection reports for January,2005 to May,2005—May 12,2005) <br /> Attachment 11 (File Narrative) <br /> Attachment 12 (Retrofit permit to change UDC sensor—May 31, 2005) <br /> Attachment 13 (E-mail regarding SB989 status—July 28, 2005) <br /> Attachment 14(Secondary containment test results—March 8,2005) <br /> Attachment 15 (Inspection report—November 30,2005) <br /> Attachment 16(Hazardous waste inspection report—December 1, 2005) <br /> Dennis Catanyag,REHS Date <br /> Registered Environmental Health Specialist <br /> 9 <br />