Laserfiche WebLink
SWRCB,January 2002 0 Page 17 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: F-1 UDC Manufacturer 0 Industry Standard F1 I Professional Engineer <br /> Other (Specify) <br /> Test Method Used: F� Pressure Vacuum Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vpl t Equipment Resolution: vplt to gph <br /> INNIESSIMENEEMEM <br /> UDC# 26 UDC# 26sat UDC# 27 UDC# 27sat <br /> UDC Manufacturer: W.f. w.f. W.f. w.f. <br /> UDC Material: fiberglass fiberglass fiberglass fiberglass <br /> UDC Depth: 31" 31" 31" 31" <br /> Height from UDC Top to Top of 9„ 91f 91, 9" <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 1/211 1/2" 1/211 1/2" <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Tested: 1 1111 1111 111' 11" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both [X]Yes❑No❑N EYes❑No[]N EYes[7]No❑N Yes[:]Not <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe ❑ ❑ ❑ � ❑ ❑ o a ❑ <br /> shutdown?* X Yes N N X Yes N N X Yes N N X Yes NoJNA <br /> Was fail-safe verified to be ❑ � ❑ ❑ � ❑ �T <br /> operational?* X Yes N N X❑Yes N N X❑Yes N N X❑Yes No <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5MIN 5MIN 5MIN 5MIN <br /> test: <br /> Test Start Time: 4 :22 4 :41 4:40 4:48 <br /> Initial Reading(RI): 5.673 4.039 1.377 5.098 <br /> Test End Time: 4 :37 4:56 4 :55 5:04 <br /> Final Reading(RF): 5.673 4.039 1.377 5.086 <br /> Test Duration: 15min 15min 15min 15min <br /> Change in Reading(RF-RI ): 000gph .000gph .000gph .001gph <br /> Pass/Fail Threshold or Criteria: .05gph .05gph .05gph .05gph <br /> Was sensor removed for testing? aYesE]N NA EYes No❑NA xYes❑No❑NA EYes❑No[]N <br /> Was sensor properly replaced and ❑ ❑ ❑ � Ex ❑ <br /> verified functional after testing? X Ye N NA X Ye N NA X Ye N NA X Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to aof the questions indicated with an <br /> asterisk(*)is "NO" or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />