My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 3:26:32 PM
Creation date
6/23/2020 6:59:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-2ale 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN E 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I I - I I I I -I I I I I 11 <br /> BUSINESS NAME(Same as FACILITY NAME) Flying J Travel Plaza-#617 3' <br /> BUSINESS SITE ADDRESS 15237 N. Thornton Rd 103' CITY Lodi 104' <br /> TL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CC_R X2632,2634,2638,2641 <br /> 90- <br /> MONITORING EQUIPMENT IS SERVICED E 1.ANNUALLY El99.OTHER(Specify): 4990 -3y <br /> M.MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49oA <br /> M TANK MONITORING IS PERFOTl1VIED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WTTH.AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT_IS: ❑ a.DRY E b.LIQUID FILLED ❑ c.PRESSURIZED_ ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER:�_ Veeder_Root 440-7. MODEL#: TLS-350 490-8 <br /> LEAK SENSOR MANUFACTURER:- Veeder Root 490'9' MODEL#(S): 794380-303 490-10 <br /> El 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKo.(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> - IN-TANK PROBE MANUFACTURER: - 490.14• MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY -490-16 <br /> _ ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h.V ❑ c.OTHER(Specify): 49aia� <br /> g•P• g•P• P fy) 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: C] a.36 HOURS El b.60 HOURS 490.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY [3 c. (Specify):OTHER(S 490-24 <br /> •J 490-25 <br /> ❑ <br /> 99.OTTER (Specify):VISUAL DONE DAILY 490-2649D.27 440-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 440.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:Ea.DRY ❑b.LIQUID FILLED_❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> _ PANEL MANUFACTURER: -Veeder Root - 4_30 MODEL#: TLS-350 - 490-31 <br /> _LEAK SENSOR MANUFACTURER: Veeder Root 490-32 MODEL#(S): 79438_0-322 �- -� •490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. E a.YES ❑b.NO 490.34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑b.NO 490-35 <br /> E 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23_CCCR2f�636L _ _ -__-_ _ _-� M-36 <br /> MLLD MANUFACTURER(S): FE PETRO 490.37 MODEL#(S):MLD 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ^_ ELLD MANUFACTURER(S) -- 40. MODEL#(S): <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0,2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> E 4.PEPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ a OTHER(Specify) N/A D/Tpos.shutdown <br /> 49046 490.47 <br /> 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 490.49 <br /> •Allowed for motdtorin orunhurW sn enc -sates fuel Piping only HSC 12S281. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(x)(3)]. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007) <br />
The URL can be used to link to this page
Your browser does not support the video tag.