My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 3:26:32 PM
Creation date
6/23/2020 6:59:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
da <br /> UNDERGROUND STORAGE TANK (a k <br /> RESPONSE PLAN - PAGE 1 (One form er facili ) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION - Ij •'``J i U Rol' <br /> I. FACILITYINFO LiLTH <br /> FACILITY ID# (Agency Use Only) " I I L5 1• <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> FLYING J TRAVEL PLAZA <br /> BUSINESS SITE ADDRESS 103. BUSINESS SITE CITY 104. <br /> 15237 THORNTON ROAD LODI <br /> .� <br /> TI 5�?!ILL CONTROL CLQ ., . , r ODS <br /> This plan addresses unauthorized releases <br /> . ,. procedures <br /> _ses from UST systems and supplements the emergency response plans and procedurr <br /> es in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> . SFIGL CONTROL A�TD CLEAN ' NT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete ly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R30. <br /> RI 1. R21. R31. <br /> R12. R22. R32. <br /> R13. R23. R33. <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> t <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Roo. TITLE R50. <br /> RICARDO BUENROSTRO GENERAL MANAGER <br /> NAME R41. TITLE R51. <br /> PAUL RIGGS DISTRICT MANAGER <br /> NAME R42. TITLE R52• <br /> JOSE JIMENEZ CA UST COMPLIANCE MANAGER <br /> NAME R43. TITLE R53. <br /> KAMI BREMSER FUEL SYSTEMS COMPLIANCE MANAGER <br /> x ` . MONI`TURING ICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ®2. INSPECTION BY QUALIFIED PERSONS ®3. RECALIBRATION OF EQUIPMENT R60. <br /> N 99. OTHER(Specify):POWDER AND WATER SENSING PASTE WILL BE APPLIED TO A MEASURING STICK AND R61. <br /> PLACED IN THE LIQUID. ANY LEVEL OF WETNESS OF POWDER THAT IN NOT REFLECTED BY THE <br /> WATER SENSING PASTE WILL BE TREATED AS FUEL AND STEPS WILL BE TAKEN IMMEDIATELY TO <br /> STOP THE RELEASE. THE STEPS IDENTIFIED IN SECTION VI WILL THEN BE FOLLOWED. <br /> UN-022B-1/3 www.unidocs.org Rev.04/02/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.