Laserfiche WebLink
SWRCB,January 2002 Page of <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested The completed form, written test procedures, and <br /> printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Flying J#617 1 Date of Testing: 11/19/2013 <br /> Facility Address: 15100 Thornton Rd, Lodi, Ca, 95242 <br /> Facility Contact: Manager Phone: <br /> Date Local Agency Was Notified of Testing: 11/14/2013 <br /> Name of Local Agency Inspector(if present during testing): NA <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Jones Covey Group,Inc. <br /> Technician Conducting Test: Arturo Perez Jr, Issac Garcia <br /> Credentials: ®CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester <br /> License Type: A,B and Haz License Number:804431 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> ICC 8061052 01-26-2015 <br /> I ncon TS-STS 01-18-2014 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> UDC 7-8 ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 11-12 ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 13 ❑ ® ❑ 1 ❑ ❑ 1 ❑ ❑ 1 ❑ <br /> UDC 14-15 ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 16-17 ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 18 ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ I ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ 1 ❑ ❑ ❑ ❑ ❑ I ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Water was recycled in water trailer for reuse. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: Date:11/19/2013 <br />