My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Gauge Equipment Resolution: +/-0.25 <br /> MEMEM <br /> Piping Run# T1toT2 Piping Run# T2toT3 Piping Run# T3toT4 Piping Run# 87Main <br /> Piping Material: Fiberglass Fiberglass Fiberglass Plastic <br /> Piping Manufacturer: Ameron Ameron Ameron OPW <br /> Piping Diameter: 2" 2" 2" 2" <br /> Length of Piping Run: 25' 25' 25' 300' <br /> Product Stored: 87 unleaded 87 unleaded 87 unleaded 87 Unleaded <br /> Method and location of STP 1 to STP 2 STP 2 to STP 3 STP 3 to STP 4 STP 2 to UDCs <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes Unable to test line 15 minutes Unable to test line <br /> starting test: <br /> Test Start Time: 8:30am 8:55am <br /> Initial Reading(RI): 5.00 psi 5.00 psi <br /> Test End Time: 9:30arn 9:55am <br /> Final Reading(RF): 5.00 psi 5.00 psi <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-RI): 0.00 psi 0.00 psi <br /> Pass/Fail Threshold or 0.00 psi 0.00 psi <br /> Criteria: <br /> Test Result: ® Pass 0 Fail D ;Pass 9 Fail ® Pass ❑Fail 1 0 Pass 11 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> " Unable to test STP 2 to STP 3 Siphon line due to a missing 2"secondary boot. <br /> " Unable to test 87 main secondary lines due to missing boots on dispensers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.