My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> F. In-Tank Gauging/SIR Equipment: l9 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): El Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> ❑ N/A that apply) Simulated leak rate:[F13 g.p.h.;❑❑0.1 g.p.h;Q0.2 g.p.h. <br /> Ck Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> [x Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Ix Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> a N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ix N/A disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ik N/A fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> CS N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page of 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.