My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 0 0 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer x Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: x Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: PRSSURE TEST GAUGE Equipment Resolution: +/-0.1" PSI <br /> Piping Run# T-2 Piping Run# T-4 Piping Run# T-5 Piping Run# T-1,T-4 <br /> Piping Material: PLASTIC PLASTIC PLASTIC FIBERGLASS <br /> Piping Manufacturer: WESTERN WESTERN WESTERN AMERON <br /> Piping Diameter: 2" 2" 2" 2" <br /> Length of Piping Run: 80' 80' 80' 30' <br /> Product Stored: 87 UNLEADED 87 UNLEADED PREMIUM SYPHON <br /> Method and location of TEST BOOT TEST BOOT TEST BOOT TEST BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES 15 MINUTES 15 MINUTES 15 MINUTES <br /> starting test: <br /> Test Start Time: 2:00 PM 2:00 PM 2:00 PM 2:00 PM <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 3:00 PM 3:00 PM 3:00 PM 3:00 PM <br /> Final Reading(RF): 3 PSI 3 PSI 5 PSI 5 PSI <br /> Test Duration: 1 HOUR 1 HOUR 1 HOUR 1 HOUR <br /> Change in Reading(RF-RI): 2 PSI 2 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or +/-0.2 PSI +/-0.2 PSI +/-0.2 PSI +/-0.2 PSI <br /> Criteria: <br /> Test Result: ❑ Pass X Fail ❑ Pass X Fail X Pass > ❑FailX Pass ❑Fait <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> T-2 ,T-4 87 UNLEADED PRODUCT SECONDARY NO VISUAL FAIL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.