Laserfiche WebLink
UNDERGROUNIWRAGE TANK MONITORING SYSTEMORTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address: Pilot/Flying J Lodi CA, <br /> 30 sat <br /> ® • w Main 30 29 sat <br /> Main 29 28 sat <br /> Main 28 27 sat <br /> Main 27 26 sat <br /> s <br /> Main 26 5a <br /> Main 25 24 sat <br /> • <br /> Transition Sump#2 <br /> Main 24 M22sat <br /> • <br /> Main 23 :�� <br /> • <br /> Main 22 21 sat <br /> Main 21 20 sat <br /> Main 20 19 sat <br /> Store#617 <br /> Pilot/Flying J Main 19 A A A <br /> Lodi CA, ST STP TP <br /> Transition sump#1 <br /> TK#1 TK#2 TK#3 <br /> DSL Diesel Diesel <br /> Monitors � l".9" <br /> Vents F F O <br /> Date map was drawn: 11 / 30 / 2010 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations <br /> of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, <br /> dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in- <br /> tank liquid level probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Page 5 of_ <br />