My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> -(Submit-minimum-of-3-sets of-pians&-applications as-origlnals-will-b-e-retained-by-EHD) <br /> 1. Site map enclosed? YES[,3 NO [ <br /> 2. Submit copies of(CC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the Jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (if <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace one(1)3/4"electrical penetration with Bravo SWAT repair penetration at T-5 STP sump. <br /> Replace one(1)2"LCX siphon penetration with Bravo SWAT repair penetration at T-5 STP sump. <br /> Fiberglass sump collar with 4 layers of matting at T-5 STP sump. <br /> Ri <br /> -, <br /> -x-17 <br /> ENVIRONMENTAL HEALTH <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> (1)BR-F-20-RETROFIT-S-LCX(2"Bravo SWAT LCX repair penetration fitting) <br /> (1)BR-F-07-RETROFIT-S(3/4"Bravo SWAT electrical repair penetration fitting) <br /> Bravo fiberglass matting,resin and catalyst <br /> EH230038(revised 7-26-2016) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.