My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
5784
>
2300 - Underground Storage Tank Program
>
PR0538018
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 9:37:23 AM
Creation date
6/23/2020 6:59:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538018
PE
2361
FACILITY_ID
FA0021953
FACILITY_NAME
CITY OF STOCKTON
STREET_NUMBER
5784
Direction
S
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
19341007
CURRENT_STATUS
02
SITE_LOCATION
5784 S FRENCH CAMP RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0538018_5784 S FRENCH CAMP_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be representative of <br /> native soils beneath the tank's invert(tank's bottom)at a collection depth not to exceed 2-4 feet. If contamination is documented <br /> during closure, an Unauthorized Release Notification must be completed and submitted within five(5)working days pursuant to <br /> California Health&Safety Code,Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> I < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000-10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> -t— PIPING AND STOCKPILE <br /> I �Jb PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> TP�T� TANK&PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> Tgp; �v BE PE-r�2MiN �9 <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER of LOCATION of SOIL MINIMUM NUMBER of <br /> # (Gallons) SOIL SAMPLES SAMPLES WATER SAMPLES <br /> <10,000 2 from wall next to tank <br /> Single Tank3 ends at soil/groundwater 1 <br /> I f- interface& 1 below tank <br /> 4 from wall next to tank <br /> > 10,000 OR ends at soil/groundwater <br /> Tank Cluster 5 or more interface& 1 below each 1 <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000-10,000 5 perTank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> Tri-Regional Recommendations <br /> Appendix A <br /> EH 23 046 (Revised 10/30/12) <br />
The URL can be used to link to this page
Your browser does not support the video tag.