Laserfiche WebLink
HEALTH AND SAFETY PLATY <br /> Site Name: City of Stockton ROW UST Removal <br /> Property Owner: City of Stockton <br /> Location: 5784 S. French Camp Road, Stockton, CA 95206 <br /> Flan Prepared Bv: RAl-1 Environmental. hie. (RAH) Revised Date: 25 September 201.3 <br /> Site Safely Officer: Craig Templo <br /> Duties: The Site Safety Officer's duties include ensuring compliance of all Federal. State; <br /> and local safety:regulations for all personnel on site. The Site Safety Officer is the point-of= <br /> contact person for all outside visitors. All initial and tailgate Safe-ty meetings will be-conducted <br /> rind docurn6nted by the Site Safety Officer. <br /> Objective: This health and safety plan is designed to help employees and visitors familiarize <br /> themselves with the risks associated with this project and steps needed to reduce injury. <br /> Project Description: This prnject consists of performing an underground storage tank.(UST) <br /> removal project..for one 500-gallon tank that complies with all regulatory requirements. The UST <br /> appears to contain a mixture of kerosene and gasoline based on recent sampling and testing;of <br /> the contents inside the tank.The project includes wrapping the crushed 500-gallon single wall st <br /> UST with 6 mil visqueen plastic sheeting, loading it on a flat bed truck,and transporting;as a <br /> hazardous waste to ECI of Richmond, an approved TSDF for disposal of USTs, There are no <br /> horizontal or vertical fuel lines attached or associated with the tank. Project includes soil <br /> sampling by others according to Tri-Regional Guidelines. Due to road safety concerns,the City <br /> of Stockton's contractor, Parsort/Brickerhoif, needed to remove the UST from the road right-of- <br /> away.Due to the tank's close proximity to S. French Camp Road, the tank excavation needed to <br /> bL backfilled with import fill immediately after removing it on an emergency basis. Please note <br /> that.RAH Environmental,Inc. was riot involved in that decision to remove the UST without h <br /> permit.from San Joaquin County. The Project Consultant (K.leinfelde�)and Parson/Brickcrhoff <br /> knows the location of the tanKexcavation and where the UST is siting onsite since it's removal. <br /> Ater opening; up the tank hole;RAH may need to perform overexcavation of TPH,i.nipacted soil <br /> prior to collecting;any confirmation soil sample(s). Again,date to road safety concerns,the tank <br /> excavation will need to be backfilled after excavating and sampling,also prior to obtaining;the. <br /> lab results of the soil satn�le(s).A.closure report will be prepared by Kleinfelder at the end of <br /> the project. <br /> Site Characteristics: The USI' is located near the center edge of the subject property near the <br /> road. <br />