My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_1988-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 4:09:45 PM
Creation date
6/23/2020 6:59:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2002
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_1988-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DMSION =< <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 rt'cis dR�'�p <br /> 209/468-3420 <br /> APPLICATION FOR PERART TO CLOSE <br /> UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br /> I. GENERAL NSTRUCTIONS: <br /> 1. Submit all information in triplicate. Answer all questions,leaving no blanks. One copy will be returned to <br /> the applicant with comments. <br /> 2. Include a detailed site map on a separate sheet of paper,showing the location of the tanks(s),piping,streets, <br /> adjacent properties (north toward the top of the page), nearby septic tanks, leachfeelds, water wells, <br /> buildings, underground public utility lines(including water, sanitary sewer and storm sewer), and distance <br /> of piping from tank to dispensers. If underground utilities are not included on the site map,you must state <br /> in writing that USA Dig will be contacted prior to excavation activities. <br /> 3. Complete page 3, "Application for Underground Storage Tank Closure Permit of :Sampling firm <br /> shall be an independent third party from the contractor. <br /> 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Subnut the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br /> Worksheet". <br /> [] 6. Complete all questions on page 10,the Public Health Services-Environmental Health Division(PHS-EHD) <br /> "Underground Storage Tank Disposition Tracking Record",except those requiring a signature and date <br /> of tank removal. The holder of the permit shall be responsible for ensuring that this form is completed and <br /> returned to PHS-EHD within 30 days of the tank removal. <br /> 7. Submit a "Site Health&Safety Plan" as an addendum to this application,to address all potential hazards <br /> for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> (] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by <br /> the County.of San Joaquin Building Department and the incorporated City Building Departments, pursuant <br /> to the Uniform Building Code STD 70-11. <br /> [] 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS-EHD <br /> approval of the closure plan. . <br /> [} 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br /> plan. If gross deficiencies are identified, an addendum will be required with a S89.00/hour fee and the <br /> review will begin on the date of resubmittal <br /> [] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br /> [] 12. Advance inspection notice of at least 48 hours is required by PHS-EHD <br /> [] 13. Submit Contingency Plan for over-excavation at time of UST removal(if planning to over-excavate). <br /> See"III. SITE MITIGATION"on Page 2. <br /> EH 23 046 (Revised 8/1/01) Page 1 <br /> A Division of San Joaquin County Health Carc Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.