Laserfiche WebLink
8. a. Describe the method that will be u1 ed to purg and/or inert the t s): <br /> Cr �cD r f l OCrr� <br /> b. Tank/Piping Hauler: <br /> Name <br /> Address t�--?5TU� City Zip 6( <br /> Phone No.( J�/© i ✓S " <br /> Hauler Registration P(If hauled as hazardous) <br /> c. Tank/Piping Disposal Site: <br /> Name <br /> (.� 1 <br /> Address5 (�� City no ZIp� wivl— <br /> Phone No.( <br /> BPA M#(If transported to a permitted TO facility) Cdh `7�pj9 <br /> 9. Is the sampling firm an independent third party from the contractor? YESX NO[[ <br /> 9a. Describe,In detail,how the soll and/or water sample(s)beneath the tank and piping will be obtained: <br /> SAM P[Xo jnlld I BE Col l-VC('E—�D ►-COM -WV `AN 1'--pit- b'D 0 f 1--+i t *tA N K 2 re�e� <br /> I�CCU NtIaTIV-ES0IL Usit40 � BhU-'Nw. 2A,"rLu:-s W I I i W-FWeD IN ')- 11 0"S CV9U WI t1= N CAg . <br /> P rW4 4 Me, WII1 EFM w VHMO A-t/ltPNO 2 PET---t 1N7D NA11`(��4oit� . l tib 1:SIi�� <br /> -�- .S U2)Lr--f-- {fx BOX- W MH -�, Cali-i; 5W r-mr-alt, M"rt.1:-7 rVL t=. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> to, 6r—O'wl' will Bt VS= A <br /> li. Handling of excavated soil: <br /> Ia)What material will be used to line the tank pit and cover the stockpile? <br /> I <br /> b)What will be the final destination of the excavated stockplle? <br /> 6 <br /> 6- <br /> c)ContamInated Soil Hazardous Waste Hauler. A 1bU <br /> Hame l Hauler Registration# <br /> Address,-;;(U�( A� CityAWA-baL 7j 9V303 <br /> Phone No.( 625 C) <br /> EH 23 046(Revised 08113199) Page 5 <br />