My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_1988-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 4:09:45 PM
Creation date
6/23/2020 6:59:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2002
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_1988-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location � �a �G'1— -AVG . sG4 wf,4 C <br /> Owner_ C q <br /> Phone No. <br /> Contractor Phone No. <br /> License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.� , load ticket, within 30 days of project completion that one of the following m <br /> placed in the excavation in 12' lifts: o materials was <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2)inch in diameter <br /> Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of roject completion, or Submission of <br /> verification that the select material described above will be placed at a minimum of five 5p) <br /> displacement and that the entire excavation will be backfilled and compacted to insure compel ante with cubic the.Uniform But din n tank <br /> Appendix Chapter 70. o Code <br /> Name (Print) <br /> tt a rmt <br /> tgna re <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.