Laserfiche WebLink
tt t <br /> 2600 Camino Ramon,Room 3E000, San Ramon, CA 94583 <br /> ROUTINENITPROCEDURES <br /> Section 2632(d)(1)Title 23 CCR,Chapter 16 <br /> UNDERGROUND FUEL STORAGE TANK <br /> Facility Name: Pacific Bell (UG010) <br /> Facility Address: 1812 COLEY AVE, ESCALON <br /> UST Installed: Double Wall Composite 500 Gallons Containing Diesel Fuel for the Emergency <br /> Generator. <br /> Piping Installed: Double Wall piping with black iron primary and fiberglass secondary for the <br /> product supply and return lines. <br /> A. The Frequency of Performing the Monitoring: <br /> Monitoring is performed continuously on the: <br /> • Double wall UST Interstitial space and the piping sump. <br /> B. The methods and equipment used to perform continuous monitoring are: <br /> • VEEDER ROOT UST Monitoring System Model #TLS-350 <br /> • Site fax modem <br /> • GPH magnetostrictive in-tank volumetric probe Model# 847390-101 <br /> • Floating liquid sensors in the: <br /> 1. UST Interstitial space Model# 794390-420 <br /> 2. Piping sump Model# 794380-352 <br /> 3. Tank Overfill Model# 790091-001 <br /> 4. Acknowledged Switch#790095-001 <br /> lAHAZMAT\PACBELL\FORMS\SBC Monitor Plan Merge.doc <br /> Printed: November 3, 2000 page 2 <br />