My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_1988-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 4:09:45 PM
Creation date
6/23/2020 6:59:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2002
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_1988-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vind <br /> Please complete one report for each tank) <br /> Tank Owner: PACIr-e C j5&t I <br /> Facility Address: 6(2— <br /> Phone#: Owners' Tank ID <br /> Tank Capacity- Contents <br /> Options to meet the 1998 Deadline Completion Dates <br /> Choose A,B,or C,then enter the target or actual completion date(s)as appropriate. <br /> Target Actual <br /> A) Permanent closure or removal of the tank and piping system <br /> B)Replacement of the tank and piping with a double-walled tank,double walled piping,and <br /> dispenser containment. (Required for non-motor vehicle fuel tanks <br /> Q Tank and piping upgrade as follows: <br /> 1)Installation of striker plate(s)in tank. <br /> 2) Installation of a 15 gallon spill container at the fill tube. <br /> 3) Installation of an overfill prevention device with one of the following: <br /> a)Automatic shutoff device. <br /> b) all float valve. <br /> c)Audible and visual overfill alarm. <br /> 4)Corrosion protection for the tank provided by one of the following: <br /> a)Tank made of non-corrodible material(such as fiberglass). <br /> b)Steel tank clad with(or encased)in non-corrodible material. <br /> c)Steel tank upgraded with interior lining and exterior cathodic <br /> protection. <br /> d)Steel tank upgraded with interior lining,exterior cathodic protection, <br /> and a bladder system. <br /> 5)Corrosion protection for the associated piping provided by one of the following: <br /> a)Piping made of non-corrodible material(such as fiberglass.) <br /> b)Installation of new fiberglass or other non-corrodible,double walled <br /> piping and dispenser containment. <br /> c)Steel piping with corrosion-resistant coating and cathodic protection. <br /> d)Steel piping upgraded with cathodic protection. <br /> 6)Installation of a line leak detector with an automatic shutoff system/device. <br /> L------L_ <br /> Date signed: <br /> Tan �e t Signature. <br /> up, du lune 2,I"? <br /> C( at choose one) <br />
The URL can be used to link to this page
Your browser does not support the video tag.