Laserfiche WebLink
;925 551 7888 # 9/ 34 <br /> 5-27-04; 8:43AM; <br /> 03/05/2004 16:18 2094683433 FIFTH FLOOR PAGE 09 <br /> Note: Enhanced Leak IDetectioa D) must be performed prior to the final inspection- � <br /> separate Permit application is required to install ELD. <br /> 2. TO BESVBAff=B t'R101R TO THE FWALWSPECTION- <br /> Complete to scale As-Built Plans <br /> ❑ Complete Monitoring and Response Plan <br /> ❑ 1'JPCF Underground Storage Tanks - bstallation Certificate of Compliance (one former <br /> rank) p <br /> ❑ Completed Underground Storage Tank Certification of Financial Responsibility form along <br /> with any required attachments <br /> ❑ Passing Line Leak Detector Test Results <br /> ❑ PassingLine Tightness Test Results d ifthe UST system does not satisfy the. <br /> California Code ofRegulations 2636(g)for autonmtir,pump shut-off) <br /> ❑ Massing Enhanced Leaf Detection Results <br /> D. WS ZCTIONS: <br /> Note.- A representutrve from the San oagwn Cotmiy EIndromnemal Health,Depa r tmmr <br /> m1w Wine=s all activities de=scribed-help . p <br /> L <br /> ❑ Tank holiday test (for fiberglass-coated el tanks) performed prior to installation in k <br /> excavation <br /> ❑• Inspection o£tank vacuum gauge(if applicable)prior to placement in excavation <br /> ❑ Tank soap test(for fiberglass tanks).perfo prior to installation in excavation <br /> ] Verification oftank set and anchorage in excavation <br /> ❑ Primary piping including Product piping; or re <br /> covesy and vent line piping soap and <br /> pressure test <br /> ❑ Secondmy piping including product pipin& vapor recovery and vent line piping soap and r <br /> pressuretest <br /> .._ :24 Hour second - j <br /> :_ =•[f-- ar3' ntainment lak®test-on ps'and uzicie'r=gfl§penstFcoiifaiia`�gii�%rE�. .`. <br /> ❑ Visual-inspection of piping to enm re proper slope prior to covering <br /> ❑ Overfill performance test <br /> ❑ Prior tQ receiving fuel, a complete functional test of tank and piping monitoring systeln(s) <br /> including overtli prevention <br /> ❑ Final inspection and-demonstration of automatic shut down(if applicable). <br />