Laserfiche WebLink
I , <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pa c I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4911-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(SI- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agencv Use Unlv) - - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) Pacific Bell Telephone Company dba AT&T California UGOI O/ESCLCA 1 I 3 <br /> BUSINESS SITE ADDRESS 1812 COLEY AVE 103 1 CITY ESCALON 104 <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions•or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> X23 CCR§2632,2634_2638:2641)____ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(•P S eci 490-3a <br /> fY$ 490-3b <br /> IIL MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> - ----•-•---------------------------- - - ---------- <br /> --------- - - - - -------- ------------- ------ - ------- <br /> PANEL MANUFACTURER: VEEDER ROOT 490-7 MODEL#: TL5-350 490-8 <br /> ---- --- -- ------------------- - -- - ----------------------- --- ------ ---- -- - ------ <br /> LEAK SENSOR MANUFACTURER: Veeder Root 4049. MODEL#(S): 794390-420 490-to <br /> El 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12 490-13 <br /> MODEL#: <br /> ----------------------------------- -------------------------------------------- - - - -- - - - -- - -- - - -- ---15 <br /> IN-TANK PROBE MANUFACTURER: a90-1a MODEL#(S): 490-1s <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> ---------------------------------------MONTHL ------------------------------------------------------------------- <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ OTHER S ecif 490-18 <br /> c. (•P Y)� 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVEN'T'ORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL.TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS ❑ b.60 HOURS <br /> 400-21 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: [Ia.ANNUALLY b.BIENNIALLY [:1c.OTHERS i 4400-25 <br /> 90-24 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL.ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY [:Ib.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM a90-z9 <br /> -- --------------------------- <br /> ---'-- -490.30 490.31'--- <br /> PANEL MANUFACTURER:Veeder Root MODEL#: TLS-350 <br /> -------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> 490-32 490-33 <br /> LEAK SENSOR MANUFACTURER: Veeder Root -- MODEL#(S)_ 794380 -208 - <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP i.e.,TURBINE SHUTDOWN. ❑a.YES ®b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ®b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 52636) 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORINS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> -----------'------------------------------{-------------------------------------------------------------------------------•--------------------------------------------------------------- 490- <br /> F -41 <br /> - <br /> ,LLD MANUFACTURER(S) 1 MODEL#(S): <br /> -- - - ------------------------------------ - ----------------------------------------------------- -------------------------------------------------- - -- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-s7 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> •Allowcd for monitoone ofunbu6ed emer encu generalm fuel piping oniv lyr HSC x+'25281 5(b93 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-5I <br /> 490 52 <br /> ❑ 99.OTHER(Specify) a90-53 <br />