My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aw <br />June 25, 2014 <br />Elena Manzo, Inspector <br />San Joaquin County <br />Environmental Health <br />1868 East Hazelton Ave <br />Stockton, CA 95205 <br />RECEIVED <br />JUN 3 0 2014 <br />AT&T Services, Inc <br />Environment, Health & SaLqWIRONMENTAL HEALTH <br />2600 Camino Ramon, Room 3SMIT/SERVICES <br />San Ramon, CA 94583 <br />Original Via Certified US Mail <br /># 70131090 0001 1368 2349 <br />RE: Completion of Required Follow -Up Action, Inspection Report dated 3-26-14, <br />AT&T Facility 1812 Coley Ave, Escalon, CA 95320 (UG010) ITS #145970 <br />Dear Elena Manzo: <br />We are pleased to report status of the corrective action that you required pursuant to your <br />Notice of Violation referenced above: <br />➢ Spill container failed. <br />Status: COMPLETED. Replaced spill bucket drain valve and bucket on 5/14/14. <br />Spill bucket test was completed and passed on 6/6/14. <br />➢ The designated operator failed to check and note the correct test date for the <br />secondary containment testing on October 3, 2013. <br />Status: ACKNOWLEDGED. In the future, we will make sure to record the <br />correct test date. <br />We trust that we are now in full compliance with all of the requirements that resulted from this <br />inspection. If you need anything more from us to close this matter, please contact me at the <br />number below. <br />Tel: 925 824 5783 <br />Email: km5428@att.com <br />cc: Karen Marasigan, Area Mgr, EH&S <br />David Dube Environmental Site Mgr <br />
The URL can be used to link to this page
Your browser does not support the video tag.