Laserfiche WebLink
r <br /> IFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I I - - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) Pacific Bell Telephone Company dba AT&T California UG010/ESCLCAl l 3. <br /> BUSINESS SITE ADDRESS 1812 COLEY AVE 103 CITY ESCALON 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> X23 CCR§2632,2634,2638.2641) ------------------------------------------------------------------------------------------------------------------------------------------------- <br /> -------------- --------------------------- <br /> UIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3a <br /> MONITORING EQUIPMENT ( p �)• 490-3b <br /> III.MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> ----------------------------------------------------------------------------------------------------------------------------------490-Z-T----------------------------------------------------------------------------8 <br /> PANEL MANUFACTURER: VEEDER ROOT ; MODEL#: TLS-350 <br /> ------------------------------------------------------------------------------------------------------------------------------------- - - ------------------------------------------------------- <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794390-420 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(n.(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> ------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> PROGRAMMED TESTS: a.0.1 h. b.0.2 h. c.OTHER S eci 490-18 <br /> g•P• g•P• ( P fy)• 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY c.OTHER(Specify): 490-2a <br /> Q ❑ ❑ ( p fY)� a90-25 <br /> ❑ <br /> 99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 496-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED Cc.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PANEL-MANUFACTURER:-Veeder-Root 490-30 '1 MODEL#: TLS-350 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder Root MODEL#(S): 794380-208 <br /> 490-32 � 490-33 <br /> ---------------------------------------------------------------------------------------------------------------------------------------'----'-----i-------------------------------------------------------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ®b.NO 490-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ®b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> _______ PRODUCT FLOW WHEN A LEAK IS DETECTED-(23 CCR X2636)____ ------ 490-36 <br /> ------------------------------ ------------------------------------------------------------------ <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> - ------------------------------------------------ - - - - - ------------------------- <br /> ELLD MANUFACTURER(S) 490-40. i MODEL#(S): 490.41 <br /> ------------------------------ ---------------------------------------------------------------------------- - ----------------------------------------------------- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FALLURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49o-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046 49047 <br /> 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ®C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> *Allowed for monitoring of unburied emergency enactor fuel piping only HSC 25281.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(x)(3)]. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />