Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: <br />P-1 Check this box if tank gauging is used only for inventory control. <br />F Check this box if no tank gauging or SIR equipment is installed. <br />This section mustbe completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: n � _ _...._..__ <br />............... ry _...ion, <br />F Yes <br />No* <br />r <br />r entry and termination, including testing for ground faults? <br />Has all„input wiring been inspected forproperM e includ._._.... testi <br />Yes <br />No* <br />3 <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />............_.�..........._... <br />Yes <br />No* <br />_: _..._ _ __..._... . ,._. _....,_.._.. <br />Was accuracy of system product level readings tested? <br />Yes <br />No* <br />Was accuracy of system water level readings tested. <br />Yes <br />No* <br />Were all probes reinstalled properly? <br />Yes <br />No* <br />Were all items on the egwpment manufacturer s maintenance checklist completed? <br />_ <br />.,.. :.... _ _. _..x.___:_....... _.... .. ,_:r.. . _ _.__._...__...._.. <br />*In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): F Checkthis box if LLDs arenot installed. <br />Complete the following checklist: <br />Yes <br />r— No * <br />Mated to veri LLD rformanc <br />equipment p q 1 n fy pe e?(Check <br />F N/A <br />all that apply) Simulated leak rate: �”" 3 gP �erti�fica�ti� � p �asa�le�a� �s� <br />F Yes <br />r No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements. <br />Yes <br />F No* <br />Was thetesting apparatus properly calibrated? <br />Yes <br />F No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />FF <br />F N/A <br />___ <br />F Yes <br />- <br />F No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />F N/A <br />__..... <br />F Yes <br />F No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />F N/A <br />disconnected? <br />• Yes <br />F No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />F N/A <br />fails a test? <br />• Yes <br />r No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />F N/A <br />Yes <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* IntheSection H, below, describehow and when these deficiencies were or willbecorrected. <br />H. Comments: <br />Suction System <br />