My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging / SIR Equipment: <br /> Q Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring . <br /> Com lete the followin checklist: <br /> ❑ Yes ❑ No * ? Has all input wiring been inspected for proper entry and termination , including testing for ground faults ? <br /> ❑ Yes ❑ No * Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No * Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No * Was accuracy of system water level readings tested ? <br /> ❑ Yes ❑ No * Were all probes reinstalled properly ? m� u <br /> ❑ Yes ❑ No * Were all items on the equipment manufacturer ' s maintenance checklist completed ? <br /> "In the Section H, below, describe how and when these deficiencies were or will be corrected . <br /> G . Line Leak Detectors (LLD) : ❑X Check this box if LLDs are not installed . <br /> Complete the following checklist: <br /> ❑ Yes t ❑ No * For equipment start -up or annual equipment certification, was a leak simulated to verify LLD performance?(Check <br /> ❑ N/A all that apply) Simulated leak rate : ❑ 3 g. p .h .; ❑ 0 . 1 g. p. h ; ❑ 0.2 g .p ,h . <br /> ❑ Yes ❑ No * Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No * Was the testing apparatus properly calibrated ? <br /> ❑ Yes ❑ No * For mechanical LLDs , does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A _ <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off ifany portion of the monitoring system is disabled or <br /> ❑ N/A disconnected ? <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A tails a test? <br /> ❑ Yes NF' NO * For electronic LLDs , have all accessiblewiring connections been visually inspected ? <br /> YesWere all items on the equipment manufacturer ' s maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H . Comments: <br /> Suction System <br />
The URL can be used to link to this page
Your browser does not support the video tag.