Laserfiche WebLink
F. In-Tank Gauging / SIR Equipment: <br /> Q Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring . <br /> Com lete the followin checklist: <br /> ❑ Yes ❑ No * ? Has all input wiring been inspected for proper entry and termination , including testing for ground faults ? <br /> ❑ Yes ❑ No * Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No * Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No * Was accuracy of system water level readings tested ? <br /> ❑ Yes ❑ No * Were all probes reinstalled properly ? m� u <br /> ❑ Yes ❑ No * Were all items on the equipment manufacturer ' s maintenance checklist completed ? <br /> "In the Section H, below, describe how and when these deficiencies were or will be corrected . <br /> G . Line Leak Detectors (LLD) : ❑X Check this box if LLDs are not installed . <br /> Complete the following checklist: <br /> ❑ Yes t ❑ No * For equipment start -up or annual equipment certification, was a leak simulated to verify LLD performance?(Check <br /> ❑ N/A all that apply) Simulated leak rate : ❑ 3 g. p .h .; ❑ 0 . 1 g. p. h ; ❑ 0.2 g .p ,h . <br /> ❑ Yes ❑ No * Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No * Was the testing apparatus properly calibrated ? <br /> ❑ Yes ❑ No * For mechanical LLDs , does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A _ <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off ifany portion of the monitoring system is disabled or <br /> ❑ N/A disconnected ? <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A tails a test? <br /> ❑ Yes NF' NO * For electronic LLDs , have all accessiblewiring connections been visually inspected ? <br /> YesWere all items on the equipment manufacturer ' s maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H . Comments: <br /> Suction System <br />