Laserfiche WebLink
SWRCB , January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1 . FACILITY INFORMATION Facility ID : 00010 <br /> Facility Name : Pacific Bell Telephone Co dba ATT California Date of Testing : 01 /30/2018 <br /> Facility Address : 1812 Coley Ave . Escalon CA 95320 <br /> Facility Contact: Thuy Tran Phone : 209474-4022 <br /> Date Local Agency Was Notified of Testing : 01 -22-2018 <br /> Name of Local Agency Inspector (f present during testing) : John Alaniz <br /> 2 . TESTING CONTRACTOR INFORMATION <br /> Company Name : TAIT Environmental Services <br /> Technician Conducting Test : John Cascio <br /> Credentials ' : OCSLB Contractor OICC Service Tech . ❑ SWRCB Tank Tester El Other (Spec) <br /> License Number(s) : A B ASB C- IO HAZ, 588098 5252163 - UT <br /> 3 . SPILL BUCKET TESTING INFORMATION <br /> Test Method Used : OHydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used : Visual Measure Equipment Resolution: 1 /16" <br /> Identify Spill Bucket (Ay Tank 10001 00001 2 3 4 <br /> Number, Stored Product, etc.) <br /> [] Direct Bury ❑ Direct Bury []Direct Bury ❑Direct Bury <br /> Bucket Installation Type : OContained in Sump ❑ Contained in Sump ❑ Contained in Sump [] Contained in Sump <br /> ❑ On Top of AST 0 O Top of AST ❑ On Top of AST ❑ On Top of AST <br /> Bucket Diameter: 11 . 001, <br /> Bucket Depth : 14 . 25" <br /> Wait time between applying 15 Min <br /> vacuum/water and start of test: <br /> Test Start Time (Ti) : 12 : 31 PM <br /> Initial Reading (Ri) : 13 . 25" <br /> Test End Time (TF) : N/A <br /> Final Reading (RF) : N/A <br /> Test Duration (TF — Tr) : N/A <br /> Change in Reading (RF - Rr) : N/A <br /> Pass/Fail Threshold or N/A <br /> Criteria : <br /> Test Result: ❑ Pass [E] Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended folloiii- tip for failed tests) <br /> VISUAL FAIL , Bucket will not hold water, Lowered water level below the upper gasket and water level still dropped <br /> Test Water Returned to Tait <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br /> Technician ' s Signature : Date : 01 /30/2018 <br /> ► State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br /> may be more stringent. <br />