Laserfiche WebLink
CEIVED <br />SWRCB, January 2006 <br />Spill Bucket Testing Report Form [ EB 2 12017 <br />This form is intended for use by contractors performing annual testing of UST spill containment structuI-q pleted form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to tAe , ,(--yrgqlWry agency. <br />1. FACILITY INFORMATION Facility ID: UG010 <br />Facility Name: Pacific Bell Telephone Co dba ATT California I Date of Testing: 2/3/2017 <br />Facility Address: 1812 Coley Ave. Escalon CA 95320 <br />Facility Contact: Thuy Tran I Phone: (209) 532-3447 <br />Date Local Agency Was Notified of Testing: 1/12/2017 <br />Name of Local Agency Inspector (fpresent during testing): Elena Manzo <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TAIT Environmental Services <br />Technician Conducting Test: Garrett Warren <br />Credentials': 21CSLB Contractor ❑X ICC Service Tech. ❑ SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): A B ASB C-10 HAZ, 588098 8185019 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: Hydrostatic ❑Vacuum ❑Other <br />Test Equipment Used: Tape Measure <br />Equipment Resolution: 1/16" <br />[Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />1 <br />UG0100001 <br />2 <br />3 <br />4 <br />Bucket Installation Type: <br />E] Direct Bury <br />Z Contained in Sump <br />El On Top of AST <br />El Direct Bury <br />❑Contained in Sump <br />El On Top of AST <br />[]Direct Bury <br />❑Contained in Sump <br />❑On Top of AST <br />❑Direct Bury <br />❑Contained in Sump <br />❑On Top of AST <br />Bucket Diameter: <br />11.00" <br />Bucket Depth: <br />14.50" <br />Wait time between applying <br />vacuum/water and start of test: <br />15 min. <br />Test Start Time (TI): <br />10:38am <br />Initial Reading (RI): <br />14 3/8" <br />Test End Time (TF): <br />11:38am <br />Final Reading (RF): <br />14 3/8" <br />Test Duration (TF — Ti): <br />1 hour <br />Change in Reading (RF - RI): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />Test Result: <br />1 ❑x Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Test water was returned to Tait's shop. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: <br />VC>rma Date: 2/3/2017 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />