My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 4:47:24 PM
Creation date
6/23/2020 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Installation Checklist <br />Fiberglass Underground Storage Tanks <br />Single -Wall (SWT), Double -Wall (DWT), Multicompartment (MCT) and OiUWater Separators (OWS) <br />Complete this checklist, and keep it with copies of any written authorizations for variations and/or deviations received from Xerxes. <br />• Date of Installation Tank Size and Capacity <br />• Tank Type SWT DWT MONITORING -FLUID DRY MCT OWS (Circle those that apply.) UL Number <br />• Site Owner <br />• Site Address <br />STREET CITY STATE ZIP <br />• Installing Contractor <br />CONTRACTOR NAME STREET CITY STATE ZtP <br />• On -Site Supervisor <br />Verified by: <br />A. Visual Inspection: No evidence of damage (holes, cracks, gouges) in tank. (Document any damage found.) ..................................... <br />B. Monitoring -Fluid Tanks: 1. Check and record monitoring -fluid level in reservoir............................................................................... <br />2. Check for monitoring fluid inside and outside of tank............................................................................... <br />C. Physical Test: Preinstallation air/soap test completed in accordance with installation instructions....................................................... <br />D. Backfill Material: (Indicate which type.) 1. Pea gravel or crushed stone as specified by XERXES......................................... <br />2. Other (Requires specific approval by XERXES — describe.) ................................. <br />E. Excavation: Hole dimensions are correct per installation instructions for appropriate conditions......................................................... <br />F. Internal Diameter Measurement: The intim diameter of the tank is measured and documented (Initial Internal Diameter in SECTION 4 below).... <br />G. Geotextile Utilized: (Indicate one.) 1. Yes 2. No.......................................................................................................................... <br />H. Hole Condition: (Indicate one.) 1. Dry hole (Water is not anticipated to reach tank — area is not subject to flooding.) ................ <br />2. Wet hole (Excavation may trap water — area is subject to flooding.) ...................................... <br />I. Traffic Loads: (Indicate one.) 1. Traffic loads anticipated.......................................................................................................... <br />2. No traffic loads anticipated..................................................................................................... <br />J. Anchoring: Performed in accordance with installation instructions. 1. Deadmen 2. Full slab ................................................... <br />K. Fittings and Other Metal Components: Coated to protect against corrosion...................................................................................... <br />Verified by: <br />A. Backfill -material bed is level and is a minimum of 12 inches deep, over native soil or slab, before setting tank ....................... <br />B. Tank Spacing: Tanks are spaced correctly from each other and from excavation according to instructions ......................................... <br />C. Visual Inspection: No evidence of damage is found after setting in hole.............................................................................................. <br />D. Hold-down Straps: Positioned and secured according to installation instructions. (See SECTION 6.4. of Installation Manual) ......... <br />E. Backfill Compacted: Material has been tamped and/or compacted to fill all voids around tank........................................................... <br />F. Tank is properly ballasted during backfilling: (wet -hole installation only)......................................................................................... <br />G. Tank(s) are buried at proper depth to conform to appropriate conditions: (wet, dry, traffic or no traffic) ....................................... <br />Verified by: <br />A. Physical Test: Air/soap test is completed according to installation instructions.................................................................................... <br />B. Internal Diameter Measurement: The intemal diameterofthetank smeasuredand documented (FiinalInternal Diameter inSECTION 4below).... <br />C. Monitoring -Fluid Tanks: 1. Check and record monitoring -fluid level in the reservoir (inches) ......................................... <br />2. Check for monitoring fluid inside tank...................................................................................................... <br />D. Containment Sump Water Test: Fill the containment sump assembly with water to check for leaks .................................................. <br />E. Installation Manual: Deliver Installation Manual and Operating Guidelines to owner.......................................................................... <br />All tanks must be measured to determine vertical deflection. Follow deflection -measurement instructions (SECTION 14) in the Installation Manual. <br />An initial internal -diameter measurement is taken and recorded as a point of reference. Subsequent internal -diameter measurements show tank deflection <br />and can be compared to the table below. Take each measurement from the same fitting using the same procedure. <br />E d C t E d <br />External Tank <br />Diameter <br />4 <br />6 <br />8 <br />10 <br />12 <br />(Feet) <br />Allowable <br />Deflection <br />112 <br />3/4 <br />1-114 <br />1-112 <br />1-3/4 <br />(Inches) <br />Internal -Diameter Measurements n en er n <br />Initial Internal Diameter (before backfilling) <br />Final Internal Diameter (after backfilling) — <br />Initial Internal Diameter minus , , , 6 6 8 6 „ „ U <br />Final Internal Diameter = Deflection <br />Verified by: <br />27 <br />11 <br />Mark the location where internal -diameter <br />measurements were taken. <br />
The URL can be used to link to this page
Your browser does not support the video tag.