My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 4:47:24 PM
Creation date
6/23/2020 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> RESPONSES TO EHD INSPECTION <br /> Date of inspection: 05/31/05 <br /> Date of response report: 07/12/05 <br /> �#2 - New A&B forms are completed to the requirements and placed in the binder in the <br /> 01- red tab. Please note there are two old plans that the operator had first submitted in 2003 <br /> when applying for permit and in January 2005 when the station was opened. The new <br /> plans contain no new technical information other than the current name of the business Z <br /> (Shell I-5 stead of 76 Stockton)and make them look cleaner and more legible. <br /> #4 - The Certification of Financial Responsibility is completed and placed in the binder <br /> in the red tab <br /> #6&7 - The new forms are completed and placed in the same red tab. Please note the <br /> old form contains pretty much the same information. L,-,e "v?'` bt&-JC <br /> #23 - Monthly inspection reports are placed in the binder in the green tab. The station <br /> missed the months of March and April however it is planned the inspection will be done <br /> on consist ant monthly basis from this point on. N-)CT,j-, ;r McL-) <br /> #21 - Water in the buckets was properly cleaned out and disposed of on July 6, 2005. <br /> Please see attached photos for details. <br /> Return to Compliance Certification will be sent in once;the representative from SJ EHD <br /> reviewed this binder to verify all the submitted documents are correct and complete. <br /> r� Cs1��-Ids <br /> Secondary Containment SB989 test was done on July 6,2005 by Alpha Petroleum. The <br /> system passed the test and AP would forward the result report to EHD shortly. o ly 1 �Z ads <br /> i <br /> It is already scheduled that all employees will be trained by TRE Consulting on July 19, <br /> 2005. <br /> #15 - Clean absorbant and container for storing used absorbent were made available on- <br /> site on June 23,2005. Employees were trained how to use absorbent to contain possible <br /> fuel spill. Please see attached photo. <br /> #90 - The HW emergency form is attached in red tab. The same form is posted at the <br /> phone location. <br /> Fee was paid on July 6, 2005 for the HW generator permit. <br /> It is now that spill control equipment are on site and available. Employee are trained how <br /> to use and dispose of used abosrbant. <br /> Wham- abo ? � �.�-�t ow-i-tw,r-5 ia C- <br /> - d ��� <br /> I ; + <br />
The URL can be used to link to this page
Your browser does not support the video tag.