My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 4:47:24 PM
Creation date
6/23/2020 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. The proposed piping indicated in plan FE -lis different from permit application page 6 <br />and 12/FE-2. Choose either Ameron 3000 LCX or A.O. Smith Red Thread. Correct this <br />conflict on both revised application and plan. <br />8. State on the revised plan to clarify the space between piping indicated on 24/FE-2 and <br />34/FE-2 (i.e. 6" or 6.5"). <br />9. Provide Legend or statement on the revised plan for the followings: <br />a. 65, 66, 70, 68, 20, 21, etc... of 1/FE-2. <br />b. 71, 106, 22, 105, etc... of 2/FE-2. <br />c. 68, 67, 77, etc... of 3/FE-2. <br />d. 26 of 31/FE-2. <br />e. 37, 61, 62, 58, etc... of 34/FE-2 <br />10. Provide the complete drawing for the followings: <br />a. 1/FE-2. <br />b. 2/FE-2. <br />c. 3/FE-2. <br />d. 11 /FE -1. <br />11. Provide drawing for the transition of underground vent line, vent sump, and above <br />ground vent line. <br />12. There is no sensor located inside the under dispenser containment per 2/FE-2. All <br />secondary containment, including under -dispenser containment shall be equipped with a <br />continuous monitoring system. State on the revised plan to satisfy this requirement. <br />13. Before the underground storage tank is placed in use, the underground storage tank shall <br />be tested after installation using one of the following methods to demonstrate that the <br />tank is product tight: <br />a. Enhanced leak detection. <br />b. An inert gas pressure test that has been certified by a third party and approved by <br />the board. <br />Provide the design and scope of work of this requirement. A separate permit is required. <br />A copy of permit is enclosed. <br />14. A copy of general instructions are attached for your reference. <br />Please noted that this review is based on Health and Safety Code 25290.2. for underground <br />storage tanks installed on or after July 1, 2003 and before July 1, 2004. If underground storage <br />tanks are installed on or after July 1, 2004, new design and requirements shall be resubmitted for <br />review. <br />If you have any further questions, please call me at (209) 468-9850. <br />Thanks, <br />ELL <br />Steven C. Shih, Senior R.E.H.S. <br />San Joaquin County <br />Environmental Health Department <br />717 W. go street, Stockton, CA 95148 — SR0037399 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.