Laserfiche WebLink
01/08/2004 <br />08:23 20946834"j2 <br />FIFTH FLOOR <br />PAGE 02 <br />ENVIRONMENTAL HEALTH DEPARTMEN'I" <br />SAN JQUIN COUNTY <br />Donna X. Heran, R-E.H.S.S <br />304 East Weber Avenue, Third Floor <br />Vnitsupervis#n <br />CaA Borgmao, R.E.111. <br />• <br />Director <br />Al Olsen, RX .11-S. <br />Stockton, California 95202-2708 <br />Mike Huggins, R,E,J-).,S.. F-D.I. <br />Douglas W. Wilson, R.E. 'A.S. <br />Aogram Manager <br />-(209) 468-3420 <br />Telephone. <br />Margaret La aro, R.El.K.S- <br />o <br />Laurie A. Cotuffit, R.E.H.S. <br />Fax, (209) 464-0138 <br />Robi.-f[ McClellon, R.E —11S- <br />Progrant Manager <br />Mark Barcnllos, R.E.H. S. <br />San Joaquin County Environmental Health Department (EHD) has established the following <br />guidelines to assist you in the completion of your construction project. The guidelines specify the <br />construction and monitoring criteria necessary to complete our review of your proposed <br />underground storage, tank (UST) system. <br />1. An installation permit and payment of appropriate fees shall be required for the <br />installation or modification of any underground storage tank system, which will be <br />used for hazardous substances. <br />2. Contractors shall submit, or have on file with the local agency, information <br />verifying that they possess a current State Contractor's License (A, B, C-36, or <br />C -61/D-40), hazardous substance removal certification, and Workmen's <br />Compensation Insurance. <br />3. The contractor shall be responsible for ensuring that conditions at the site provide <br />for workplace safety, protection of the envirom-ncnt, and maintenance and <br />integrity of nearby structures. <br />4. Under no circumstances shall any regulated material be placed into any <br />underground tank system without approval of the EHD- <br />5. All tanks, piping, and equipment shall be installed and tested in accordance with <br />the manufacturer's recommendations/guidelines. <br />6. All interstitial monitors must perform according to manufacturer's standards, and <br />must be tested annually in accordance with section 2630 (d), California Code of <br />Regulations (CCR), Title 23 Waters, Division 3, Chapter 16. <br />7. Permits and/or plan check approval may also be required by the San <br />Joaquin Valley Unified Air Pollution Control District, the County/City 1311ildinR <br />Department and the appropriate Fire District. <br />8. Applicant/contractor shall adhere to the approval plan and any change or <br />deviation shall be reported to and approved by EHD prior to installation. <br />9. The application for installation of underground tanks is only valid for the: <br />calendar year in which it has been issued: A permit may be extended into the <br />next calendar year if a letter is sent to EHD requesting this extension thirty <br />days prior to the end of the calendar year. A one time, one year extension <br />may be granted by EHD upon receipt of this letter, <br />- I - <br />