My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 4:47:24 PM
Creation date
6/23/2020 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/00/2004 08:23 20946834lq FIFTH FLOOR PAGE 03 <br />SITE MITIGATION: <br />1:1.3 <br />a. In the event contamination is observed, confirmed or suspected as a <br />result of a; leaking UST system it is the responsibility of the owner or <br />operator to submit a work plan to EHD Site Mitigation Unit prior to <br />initiating any assessment or remediation activities. <br />b. TAinim= delays, a Corrective Action Plan maybe submitted <br />concurrent with tank closure or installation plans. Address one copy of <br />the Correc <br />�t ive Action Plan to the Site Mitigation Unit for review. For <br />further assistance contact the Site Mitigation Unit at (209) 46:3-3450. <br />PLAN REVIEW AND OPERATING PERMIT., FEES <br />1. New facility plan. review fee of $744.00 (8 hour minimum per facility), $500-00 <br />facility fee (includes one tank), $125.00 per tank after the first tank, Plus $10-00 <br />state surcharge fee per tank is due at time of plan submittal plus $17.50 per site <br />state surcharge. <br />2. New installation of at additional tank at an existing facility is $744.00 plan review <br />fee (8 hour minimumm per facility) plus $125.00 per new tank afterrf-irst tank, and <br />I <br />$10.00 per new tank state surcharge fee. <br />3. It should be -noted that a $744.00 plan review check fee required for each submittal <br />allows for up to eight, (8) hours of staffreview and/or inspection time. Additional <br />time spent on plan review, meetings, inspections, phone or office consultations will <br />be billed to the applicant at a rate of $93.00 per hour. <br />4. The maximum review time for UST installation plans is 40 working days.. A <br />preliminary review will be conducted by the EHD within 20 working days of <br />submittal date to identify any gross plan deficiencies. <br />5. if gross deficiencies are identified, the plans will be returned with a checklist <br />i <br />identifying plan deficiencies. <br />6. To expedite the review of installation plans, time and a half per hour overtime fee <br />maybe submitted to have review completed within 10 working days of submittal <br />date if staff is available to perform the review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.