My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 4:47:24 PM
Creation date
6/23/2020 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/08/2004 08:23 2094683433 FIFTH FLOOR PAGE 13 <br />a ft <br />SAN JOAQM COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE I <br />TYPE OF ACTION 0 1. NEW PLAN 2. CHANCE OF INFORMATION moil <br />PLAN TYPE [J MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY- <br />MCI <br />((;bcck one item only) L] THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />FACILITY ID # (Agwwy Use Only) <br />FACILITY NAME <br />FACILITY SITE ADDRESS mol. <br />CITY <br />M05. <br />state law requires that testing, preventive maintenance, and calibration of mortilaring equipment (e.g., sensors, probcs,)inc leak detector,,, etc.) be performed in <br />MOC <br />accordance with the equipment manufacturers' instructions, or annually, whichever i� more frequent. Such work must be performed by qualified persojincl. <br />MONITORINGEQUIPMENT IS SERVICED El 1. ANNUALLY rl 99. OTHER (Specify)- <br />M07 <br />his i ring plan must include a Site Plan showing the general tank and piping layouts and the location-; where monitoring is performed (i.e,. loc -f each <br />w-nsor, <br />line leak detector, monitoring system control pancl, ctc.)- If you already have a diagrarn (e,g., current UST Monitoring Sitc Plan from a Mcmitoring Systern Certiflc;ation <br />form, Hazardous Materials Busircss Plan etc,) which shows all rcqviTcd information, include it with this plan. <br />cr <br />MONITORING IS PERFORMED USING TRE FOLLOWING METHOD(S): (Check all that apply) <br />M10. <br />a]. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAuLT(S' ), <br />SECONDARY CONTAINMENT IS: a. DRY Kb. LIQUID FILLED c. UNDER PRESSURE d. UNDER VACUUM <br />M'l- <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER; M16. MODEL #: <br />MIT <br />IN -TANK PROBE MANUFACTURER! mls- MODF-L*(S): <br />M19. <br />LEAKTEST FREQUENCY: a. CONTINUOUS b. DAILYINIGHTLY WERYLY <br />MM <br />4. MONTHLY c. OTHER (Specify): <br />PROGRAMMED TESTS: n a. 0. 1 g,p.h. jj b. 02 g,p,h, c. OTHER (Specify): V5:2 W3 <br />3. INVENTORY RECONCILIATION [3 a. MANUA). PER 23 CCR §2646 171 b. STATISTICAL PER 23 CCR§2646-1 <br />NC4, <br />r_1 4. WEEKLY MANUAL TANK CiALJGINQ (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: . Q a. 36 HOURS [I b, 60 HOURS <br />5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />M.!6 N127. <br />TEST FREQUENCY: a. ANNUALLY 0 b. BIENNIALLY El c. OTHER (Specify): <br />El 6 -VISUAL MONITORING DONE: a. DAILY b. WEEKLY (Requim zgency appro�D <br />99. OTHER (Specify): <br />MM <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: a. DRY [I b. LIQUID FILLED 0 c. UNDER PRESSURE 1. UNDERVACLIUM <br />X <br />M11 <br />PANEL MANUFACTURER, P-C�Ot MODEL #: _T L- 5 35-0 <br />M33. <br />WILI, A PIPING LEAK ALARM TRjGG9R AUTOMATIC PUMP (i.c., TURBINE) SHUTDOWN? Xa. Yi.,Snb.. NO <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 1:1 a. YES [I b- �10 <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 S.p.h. LL -AK TESTS AND RESTRICT'S OR SIT�JTS OFF <br />pR0DuCj- FLOW W14EN A LEAK IS DBT M39. <br />do MODEL A(S)" o96 -5-rx <br />MLLD MANUFACTURER(s): -r, <br />3- 5LECTRONIC LINE LEAK DETECTOR. (ELLD) THAT ROUTINELY PERFORMS 2.0 g.p,h. LEAK TESTS <br />PROGRAMME)) LINE INTEGRITY TESTS: a, MINIMUM MONTHLY 0.2 - h. Q b. MINIMUM ANTOJAL 0.1 U.?.h. <br />M4.2, <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SIJUTDOWN? a. Yl�$ b. NO <br />M43. <br />WILL SLLD rAILLME/DISCONNSCTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br />ED 4. INTEGRITY TESTING <br />W5, <br />TEST FREQUENCY: a. ANNUALLY b. EVERY 3 YEARS El c, OTHER (Specify) <br />9 0 MTN. MONTHLY& EACH TIME 15YSTEM QPERATEr- <br />M46, <br />M47. <br />[I 5.VISUAL MONITORINO DONE: a, DAILY b. WEEKLY* c. <br />0 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §26366(a)(3) <br />7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />99. OTHER (Specify) <br />M48. <br />suc=`d (0,m3)^1/4 v7/2J/U3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.