My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:00:07 PM
Creation date
6/23/2020 6:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2007-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />®Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used Pressure gauge, stop watchme <br />Piping Run #Unlead Piping Run #Premum <br />Piping Material: fiberglass fiberglass <br />so <br />Equip nt Resolution: 1 <br />Piping Run #Diesel Piping Run # <br />fiberglass <br />Piping Manufacturer: <br />A.O.Smith <br />A.O.Smith <br />A.O.Smith <br />Piping Diameter: <br />3.5 <br />3.5 <br />3.5 <br />Length of Piping Run: <br />160 <br />180 <br />120 <br />Product Stored: <br />gasoline <br />gasoline <br />diesel <br />Method and location of <br />piping -run isolation: <br />test boot <br />test boot <br />test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10mins <br />lOmins <br />10mins <br />Test Start Time: <br />60mins <br />60mins <br />60mins <br />Initial Reading (R,): <br />5psi <br />5psi <br />5psi <br />Test End Time: <br />Omins <br />Omens <br />Omens <br />Final Reading (RF): <br />5psi <br />5psi <br />5psi <br />Test Duration: <br />60mins <br />60mins <br />60mms <br />Change in Reading (RF -R,): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Opsi/60ins <br />Opsi/60 s <br />Opsi/60ins <br />Test Result: <br />® Pass ❑ Fail <br />Z Pass ❑ Fail <br />0 Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.