Laserfiche WebLink
Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />®Pressure <br />❑ Other (Specify) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used Pressure gauge, stop watchme <br />Piping Run #Unlead Piping Run #Premum <br />Piping Material: fiberglass fiberglass <br />so <br />Equip nt Resolution: 1 <br />Piping Run #Diesel Piping Run # <br />fiberglass <br />Piping Manufacturer: <br />A.O.Smith <br />A.O.Smith <br />A.O.Smith <br />Piping Diameter: <br />3.5 <br />3.5 <br />3.5 <br />Length of Piping Run: <br />160 <br />180 <br />120 <br />Product Stored: <br />gasoline <br />gasoline <br />diesel <br />Method and location of <br />piping -run isolation: <br />test boot <br />test boot <br />test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10mins <br />lOmins <br />10mins <br />Test Start Time: <br />60mins <br />60mins <br />60mins <br />Initial Reading (R,): <br />5psi <br />5psi <br />5psi <br />Test End Time: <br />Omins <br />Omens <br />Omens <br />Final Reading (RF): <br />5psi <br />5psi <br />5psi <br />Test Duration: <br />60mins <br />60mins <br />60mms <br />Change in Reading (RF -R,): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Opsi/60ins <br />Opsi/60 s <br />Opsi/60ins <br />Test Result: <br />® Pass ❑ Fail <br />Z Pass ❑ Fail <br />0 Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />