Laserfiche WebLink
SWRCB, January 2002 Page _ of _ SWRCB, January 2002 <br />q b Trl <br />Test Method Dec eloped By: <br />LDDC Manufacturer <br />Oilier (Sys—b) <br />Industry Standard <br />Professional Engineer <br />Fill Riser Containment Sumps me Present, but were Not Tested <br />Test Method Used: <br />Pressure <br />Outer (Specify) <br />Vacuum <br />- <br />Hydrostatic <br />Test Equipment Used: <br />Pressure <br />Other (Specht' <br />Vacuum <br />Hydrostatic <br />Equipment Resolution: <br />Test Equipment Used: <br />UDC Manufacturer: <br />UDC# <br />LDC At <br />LMC# <br />Fill Sump # <br />UDC# <br />Fill Sump # <br />UDC Material: <br />Sump Depth: <br />UDC Depth: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Height from UDC Bottom to Top <br />ofilkhest PipmR Penetration: <br />Condition of sump prior to <br />testis <br />Height from UDC Bottom to <br />Lowest Electrical Pwetration: <br />Portion of'Sump Tested <br />Condition of UDC prior to <br />testing: <br />Wait time between applying <br />pressuravacuum/aater and <br />starting test: <br />Portion ofUDC Tested <br />Test Start Time: <br />Does turbine shut down when <br />JDsmsordetmts liquid (both <br />rot and —ter)? <br />r1-- <br />Yes No NA <br />Yes <br />No NA <br />Yes No <br />NA <br />Yes <br />No NA <br />Turbine shutdown response time <br />Final Reading ): <br />Is system programmed for fail- <br />safe shutdown? <br />Yes No NA <br />Yes <br />No NA <br />Yes No <br />NA <br />Yes <br />No NA <br />Was fail-safe verified to be <br />o tram]?' <br />Yes No NA <br />Yes <br />No NA <br />Yes No <br />NA <br />Yes <br />No NA <br />Wali time between applying <br />pressurr/vacuumluater and <br />starting test <br />Test Result, <br />::Pass - Fa0FYmNo <br />Test Start Time: <br />Pass Fall <br />Pass <br />-FirIs <br />there a sensor in the sump? <br />Yes No <br />Yes No <br />Initial Reading <br />No <br />Does the sensor altars when <br />either prduct m water is <br />detected? <br />Yes No NA <br />Yes No NA <br />Yes No <br />NA <br />Test End Time: <br />Yes No NA <br />Yes No NA <br />Yes No <br />NA <br />Was sensor properly replaced and <br />verified funeuwel a testis <br />Yes No NA <br />Final Readin (R,): <br />Yes No NA <br />Yes Na <br />NA <br />Test Duration: <br />Change in Reading Rr): <br />PassiFail Threshold or Criteria: <br />Test Residt- <br />I Pass FaR <br />'Pun FI <br />Paas <br />Fail <br />Pass FW <br />Was sensor removed for testis ? <br />Yes No NA <br />Yes <br />No NA <br />Yes No <br />NA <br />Yes <br />No NA <br />Was sensor properly replaced and <br />verif d functional after testin <br />Yes No NA <br />Yes <br />No NA <br />Yes No <br />NA <br />Yes <br />No NA <br />Comments— linoludeComments— mfo—dan on r�irs modeprior to ImMig, andre mmerrdedfollov-upforfailed tese)on r�irs modeprior to ImMig, andre mmerrdedfoll-upforfarled lese) <br />'If the entire depth of the UDC is not tested, specify how much was tested If the answer to Ml of the questions indicated w•itb m <br />asterisk (*) is `NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />Page _ of <br />R FII I. RICER VnT,*r ATNMFNT CT1&1P TRCTTN(I <br />Facil ity is Not Equ ipped With Fill Riser Containment Sumps <br />Fill Riser Containment Sumps me Present, but were Not Tested <br />Test Method Developed By: <br />Sump Manufacturer <br />Other (Spec fv) <br />Industry Standard Professional Engineer <br />Test Method Used: <br />Pressure <br />Other (Specht' <br />Vacuum <br />Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Sump Diameter: <br />Fill Sump # <br />Fill Sump # <br />Fill Sump # <br />Fill Sump Of <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testis <br />Portion of'Sump Tested <br />Sump Material: <br />Wait time between applying <br />pressuravacuum/aater and <br />starting test: <br />Test Start Time: <br />Initial Reading <br />Test End Time: <br />Final Reading ): <br />Test Duration <br />Change in Reading <br />PassiFail Threshold or Criteria: <br />Test Result, <br />::Pass - Fa0FYmNo <br />Pass Fall <br />Pass <br />-FirIs <br />there a sensor in the sump? <br />Yes No <br />Yes No <br />Yes <br />No <br />Does the sensor altars when <br />either prduct m water is <br />detected? <br />Yes No NA <br />Yes No NA <br />Yes No <br />NA <br />Was sensor removed for testing? <br />Yes No NA <br />Yes No NA <br />Yes No <br />NA <br />Was sensor properly replaced and <br />verified funeuwel a testis <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Yes Na <br />NA <br />Comments—/incGrde ufonnation on repair madep�iar roiesftng.m:drecommendedjollmr-epforfaded rase/ <br />E <br />