Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Shell I-5 <br />Date of Testing 03/28/2012 <br />Facility Address: 717 W. Eighth St., Stockton, Ca. 95206 <br />Facility Contact: Joe Dangtran Phone: (209) 939-0961 <br />Date Local Agency Was Notified of Testing : <br />Name of Local Agency Inspector (rf present during testing): Thuy Tran <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: Reliable Petroleum Services, Inc. <br />Technician Conducting Test: Guadalupe Sanchez <br />Credentials': x CSLB Contractor x ICC Service Tech. ❑ SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): 883706 5250451 -UT <br />Z CPTi 7 RTTI' L? T rr1V rrYWTn SATiNd-u"sm <br />Test Method Used: <br />xHydrostatic O Vacuum 0 Other <br />s <br />Test Equipment Used Standard Tape Measure <br />Identify Spill Bucket (By Tank 1 Tl: 87 Fill <br />Number, Stored Product, etc. <br />Bucket Installation Type: Direct Bury <br />x Contained in Sump <br />Bucket Diameter: 12" <br />r <br />2 T2: 91 Fill <br />Direct Bury <br />x Contained in Sump <br />12" <br />Equipment Resolution: N/A <br />3 T3. Diesel Fill 4 T4: <br />Direct Bury Direct Bury <br />x Contained in Sump Contained in Sum <br />12" <br />Bucket Depth: <br />14" <br />14 1/8" <br />143/4" <br />Wait time between applying <br />vacuum/water and start of test: <br />I minute <br />1 minute <br />1 minute <br />Test Start Time (TI): <br />2:52 p.m. <br />2:51 p.m. <br />2:53 p.m. <br />Initial Reading (Ro: <br />13 1/8" <br />13 ''/," <br />13 7/8" <br />Test End Time (TF): <br />3:52 p.m. <br />3:51 p.m. <br />2:53 p.m. <br />Final Reading (RF): <br />13 1/8" <br />13 '/" <br />13 7/8" <br />Test Duration (TF— TI): <br />1 hr <br />lhr <br />1 hr <br />Change in Reading (RF- RI): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16" <br />1/16" <br />1/16" <br />Test Result: x Pass ❑ Fail <br />irAMM1Pn*Q -1-4- <br />z Pass ❑ Fail <br />z Pass ❑ Fail <br />Pass ❑ Fail <br />i---------- -•y�-• •••»•.�.• •.•.. c w rlur 6u texttn ana recommenaett oUow-u orfailed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Sign Date 03/28/2012 <br />' �4 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />