My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:00:07 PM
Creation date
6/23/2020 6:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2007-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSES TO NOV <br />Site: Shell I-5, 717 W. 8h Street, Stockton, CA 95206 <br />From: Joe Dangtran <br />Date: May 13, 2011 <br />Inspection Date: April 19, 2011 <br />Inspector: Thuy Tran <br />Mm <br />Items 24, 25, 26: I will follow your instruction to make sure the Monitoring System <br />Certification is done in March of every year. <br />Note: I was told the DO report must be done monthly. It could be done on the last day of <br />the month and another report could be done on the very first day of the next month. I <br />don't mean to be cynical but the description in item 24 said the MSC must be done <br />annually so could it be interpreted that the MSC could be done on Dec 31 for one-year <br />and on Jan 1 for the next year just like the DO? I reminded my DO about the <br />requirement of the MSC in March but he told me there is +/- 30 days window from <br />"anniversary" month. He got busy and assured me it will be ok and done before end of <br />April. This is the first time I heard that the MSC must be done within the "anniversary" <br />month. I have no problem with that for future ones. <br />Item 8: The EPA number CAL000306946 is now reactivated. I did reactivate the number <br />in March 2010. In August 2010 I checked and the number was still valid when Ramos <br />Environmental picked up old dirty water from 55 -gallon barrel at Shell I-5. I have no <br />idea how it got deactivated after that. It's ok now. <br />Item 20: The label on green trash container listed Nozzle Hoses because those were all <br />we had. One strange filter found in that container was not generated from this facility. I <br />regularly checked things around here because people constantly dumped "trash" here. <br />The last time I checked I recall seeing no filter. But a crazy filter got thrown in there <br />must be very recent. Since it's there I added "filter" to the label. The label on the 55 - <br />gallon listed "Dirty Oily Water" it could be so obvious that water is liquid so I could have <br />overlooked and didn't check the box of "Liquid". But corrections were all made on-site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.