Laserfiche WebLink
MIN E <br /> IED pROGRAM CONSOLIDATED FOR <br /> UNDERGROUNDSTORAGETANK <br /> MONnORINGPj� - a e2of2) <br /> ' (Chck all <br /> VI.UNDER DISPENSER CONTAINMENT MONITORING <br /> that <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) 490-54a <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STANDALONE 490-54b. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-s6. <br /> a�-ss. MODEL#:TLS-350 <br /> LEAK MONITOR MANUFACTURER:V@@d@r Root ago s7490-58. <br /> LEAK SENSOR MANUFACTURER:Veod@r Root MODEL#(S):208 <br /> a.YES ❑ b.NO 4w9- <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES [Ib.NO 4"-60UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 49"1. <br /> UD <br /> FAILURE/DISCONNECTION OF C MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO <br /> ® a.YES ❑ b.NO 49"2- <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. 490-65 <br /> t.SINGLE WALL ❑ 2.DOUBLE WALL <br /> UDC CONSTRUCTION IS: ® a <br /> IF DOUBLE WALL: a LI UID ❑ b.PRESSURE ❑ c.VACUUM <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ Q 490-64b. <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO <br /> . PERIODIC SYSTEMTESTING 45. <br /> 1.ELD TESTING THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOEAT ENHANCED <br /> LEAK DETE ON LD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE Iu ccR§2644.11 4966 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.67. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> CO KEEPING 4vaba. <br /> The following monitoring/maintenance records are kept for this facility: <br /> ® aULTS <br /> .ALARM LOGS b.VISUAL INSPECTION RECORDS ❑ e.Tc. ANNK GAUGING RESULTS(and K INTEGRITY TESTING supporting documentation records) <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ <br /> ® f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.E UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> TRAINING 490-69a- <br /> REFERENCE <br /> go bva <br /> Personnel with UST monitoring responsibilities are familiar with all of the following is relevant to their job duties: <br /> REFE CE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) 490-6%. <br /> THISUNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-W <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-9a <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-6%_ <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-W. <br /> STATISTICAL INVENTORY RECONCILIATION 490598. <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-691. <br /> 4"i. <br /> ❑ OTHER(Specify): ys Qpetat 490 70. <br /> This facilityhas a"Designated UST operator"who has passed the California UST S tem or Exam administered by the International Code Cauncit <br /> (ICC)_ The "Designated UST operator" <br /> will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management Practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> D Names)of contact persons)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION 490 71 <br /> Provide additional txamments here or indicate how many pages with additional information on specific monitoring procedures are attach to this plan. <br /> _ _ g 1.. j A �y g ,y i <br /> N p r @i° °°•° ; �J ',..f ` _ . L' 4 l A �1°' ��' P 1�Sgj s fe^� i3°rte $ o.S 'Sd t a�� � f <br /> @^ b l e <br /> PERSONNELR <br /> ESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l.)the daily/routine UST monitond maim of UST leak detection equipment covered <br /> b this Ian occurs;2. all conditions that indicate a sible release are investigated;and 3. amonitoring records are maintained ro 1 . <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITOQUIPMENT MAINTENANCE: 490.73 <br /> ;; a ft 490-72. TITLE: 490.75. <br /> NAME: ${ , r a,.sTrR� .NAME. 490-74. TITLE: <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,prothe owner/odor,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> I. OWNER(OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the i[IFOCIPation provided herein is true and accurate to the best of my knowledge. 490-77 <br /> APPLICANT SIGNATURE DATE: <br /> REP1.Tank 2.Facili 3.Autlroraedit 've dGmer 490-76. 490-74. <br /> 49U-74, APPLICANT TITLE. <br /> APPLICANT NAME(print): Owner <br /> v "IrtRe A <br /> `:� <br /> UPCF UST-D(tZ -3/4 www.unidoes.org <br />