My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAFAYETTE
>
1602
>
2300 - Underground Storage Tank Program
>
PR0500848
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:40:26 PM
Creation date
6/23/2020 7:00:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0500848
PE
2381
FACILITY_ID
FA0004909
FACILITY_NAME
CALIFORNIA WATER SERVICE CO - STK CUST/OPS CENTER
STREET_NUMBER
1602
Direction
E
STREET_NAME
LAFAYETTE
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15504001
CURRENT_STATUS
02
SITE_LOCATION
1602 E LAFAYETTE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2381_PR0500848_1602 E LAFAYETTE_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After cutting, the two 3 -inch lines will be surveyed with a camera to determine how far <br />they go into or under the building foundation. The 11/2 -inch line and the two 3 -inch lines <br />will be grouted with concrete (neat cement) and plugged. If the sections of piping into <br />or under the building foundation are greater than 20 feet long, it is proposed to obtain a <br />soil sample under the piping by directional drilling, approximately 20 feet in, under the <br />piping. If less than 20 feet, the samples already taken at the building foundation 12 -PH <br />and 13 -PH would suffice. CE has submitted a Closure In Place request for the piping <br />under the building only, along with this Workplan. <br />Soil samples have been collected beneath the 3 -inch piping in three places: <br />approximately 20 feet and 42 feet west of the curb line and at the building foundation (2 <br />samples have been collected at the building, 2 feet and 4 feet below the piping, 12 -PH <br />and 13 -PH respectively). The two 3 -inch pipes and the 1 Y2 inch piping will be removed, <br />handled and disposed of as hazardous wastes at ECI in Richmond, CA. <br />In the southern area of the two pipeline trenches, three (3) pipelines were discovered: a <br />1 Y2 -inch, a two-inch and a three-inch pipeline, at approximately two feet below ground <br />surface. The 11/2 -inch line had residual heavy petroleum hydrocarbons. The pipelines <br />ended at the curb line. These three (3) pipelines will be handled and disposed of as <br />hazardous waste. The piping associated with the USTs will be disposed of as <br />hazardous waste at ECI in Richmond, CA. The continuation of these pipelines past this <br />point and potentially across the driveway toward the building is being investigated. <br />Upon completion of field operations, a report will be prepared and submitted to the <br />County. The report will include analytical results, hazardous waste manifests, and other <br />documentation of the field work including photographs. Field activities and the <br />preparation of the report will be under the direct supervision of a CE geologist or an <br />engineer registered in the State of California. <br />5.0 Signature <br />This workplan has been prepared under the direction of the person listed below <br />Reuben H. Chow, P.E. <br />Chow Engineering, Inc. <br />CE Project No. 11 R-120 <br />Work Plan — Cal Water Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.