My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAFAYETTE
>
1602
>
2300 - Underground Storage Tank Program
>
PR0500848
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:40:26 PM
Creation date
6/23/2020 7:00:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0500848
PE
2381
FACILITY_ID
FA0004909
FACILITY_NAME
CALIFORNIA WATER SERVICE CO - STK CUST/OPS CENTER
STREET_NUMBER
1602
Direction
E
STREET_NAME
LAFAYETTE
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15504001
CURRENT_STATUS
02
SITE_LOCATION
1602 E LAFAYETTE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2381_PR0500848_1602 E LAFAYETTE_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be representative of <br />native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. if contamination is documented <br />during closure, an Unauthorized Release Notification must be completed and submitted within five (5) working days pursuant to <br />California Health & Safety Code, Section 25295. <br />WATER NOT PRESENT IN THE TANK PIT <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION OF SOIL SAMPLES <br />MINIMUM NUMBER of <br />WATER SAMPLES <br />< 1,000 <br />1 per TankFill <br />OR Pum End of Tank <br />2 from wall next to tank <br />1,000 - 10,000 <br />2 per Tank <br />1 at each End of Tank <br />3 <br />> 10,000 <br />3 or More <br />per Tank <br />Ends and Middle OR generally <br />spaced along the length of the Tank <br />PIPING AND STOCKPILE <br />PIPING SOIL SAMPLES <br />1 Sample every 20 lineal feet <br />TANK & PIPING STOCKPILE SAMPLES <br />2 Samples every 50 cubic yards <br />WATER IS PRESENT IN TANK PIT <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER of <br />SOIL SAMPLES <br />LOCATION of SOIL <br />SAMPLES <br />MINIMUM NUMBER of <br />WATER SAMPLES <br />< 1,000 <br />< 10,000 <br />Center and Ends OR Sides of Tank <br />2 from wall next to tank <br />1,000 - 10,000 <br />5 per Tank <br />Single Tank <br />3 <br />ends at soil/groundwater <br />1 <br />Ends and Middle and generally spaced <br />along the length of the Tank <br />interface & 1 below tank <br />4 from wall next to tank <br />> 10,000 OR <br />5 or more <br />ends at soil/groundwater <br />1 <br />Tank Cluster <br />interface & 1 below each <br />tank <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br />collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL SAMPLES <br />< 1,000 <br />3 per Tank <br />Center and Ends OR Sides of Tank <br />1,000 - 10,000 <br />5 per Tank <br />Center and Ends OR Sides of Tank <br />> 10,000 <br />5 OR More per Tank <br />Ends and Middle and generally spaced <br />along the length of the Tank <br />Tri -Regional Recommendations <br />Appendix A <br />EH 23 046 (Revised 8/1/11) 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.