Laserfiche WebLink
PROJECT: SOUTH PARCEL Log Of Boring TR-7 <br /> 0 Alk <br /> Stockton, California PAGE 1 OF 1 <br /> Boring location: See Figure 2,Site Plan <br /> NOTES: Logged by P.Cusack <br /> Date started: 10/4/96 1 Date finished: 10/4/96 <br /> Drilling method: 8-inch O.D. hollow-stem au er <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> O <br /> W g E go¢ w o ° MATERIAL DESCRIPTION <br /> tE m <br /> N <br /> SILTY SAND with GRAVEL (SM) <br /> 1 SM brown, loose, dry <br /> 2 lei 1/2.5 o 20 becomes moist <br /> 3 18 SILTY SAND with CLAY (CL) <br /> 4 gray,fine, moist <br /> s <br /> CL <br /> 6 <br /> 18/ 216.5 0 13 <br /> 7 18 <br /> 8- <br /> 9- <br /> 10— <br /> Bottom <br /> 910Bottom of boring terminated at a depth of 10 feet. <br /> 11 Groundwater was not encountered. <br /> 12Boring backfilled with cement/bentonite grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17— <br /> is- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27 <br /> 31415161718192021222324252627 <br /> 82930 28- <br /> 29- <br /> 30- <br /> 7rgadWdERW10 Project No.2003.02 Figure 3g <br />