Laserfiche WebLink
In <br /> PROJECT: SOUTH PARCEL Log of Boring TR-22 <br /> Stockton, California PAGE 1 OF 1 <br /> Boring location: See Figure 2,Site Plan <br /> Date started: 10/7/96 Date finished: 10/7/96 NOTES: Logged by P. Cusack <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLE <br /> S z pp )9 <br /> Lu <br /> 8 m y o' ? MATERIAL DESCRIPTION <br /> N <br /> SILTY SAND with GRAVEL (SM) <br /> 1 brown, loose, with brick fragments <br /> 2 SM <br /> 18/ 1/2.5 0.9 17 <br /> 3 18 <br /> SILTY SAND with CLAY (CL) <br /> 4 brown, fine, moist, no odor <br /> 5- <br /> 6β€” 18/ 2/6.5 0.4 3 CL <br /> 7 16 <br /> 8- <br /> 9β€” <br /> toβ€” <br /> Bottom <br /> 910Bottom of boring terminated at a depth of 10 feet. <br /> 11 Groundwater was not encountered. <br /> 12Boring backfilled with cement/bentonite grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 28- <br /> 29- <br /> 30 <br /> 31415161718192021222324252627282930 <br /> TYeadwell&ftllo Project No.2003.02 Figure 3v <br />