Laserfiche WebLink
PROJECT: <br /> SOUTHIFARCEL Log Of Well MW-8 <br /> Stockton, California <br /> PAGE 1 OF 1 <br /> Boring location: See Site Plan, Figure 2 NOTES: Logged by P. Cusack <br /> Date started: 10/3/96 1 Date finished: 10/3/96 <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon WELL CONSTRUCTION <br /> M DETAILS <br /> s <br /> W m ffi m o m 8 o MATERIAL DESCRIPTION <br /> g °_ Traffic-rat <br /> Christy box <br /> SILTY SAND with GRAVEL(SM) <br /> 1 brown, dry <br /> 2 2-inch PVC <br /> 3 casing <br /> q SM <br /> 5 <br /> 6 1a/ 1/6.5 0 12 <br /> 15 Cement <br /> 7 grout <br /> 8 <br /> SILTY CLAY(ML) <br /> 9 dark gray,moist <br /> 10- <br /> 18/ 2/11.5 0 9 <br /> 11 15 ML <br /> 12 with fine sand and white mottling Bentonite <br /> 13 pellets <br /> 14- <br /> 15— <br /> SILTY <br /> 415 SILTY SAND with CLAY(SM) Sand <br /> 16 18/ 3/16.5 0 10 brown, moist <br /> 15 <br /> 17 <br /> 18 <br /> SM <br /> 1g Perforated <br /> 20 no odor interval 0.01- <br /> 18/ 4/21.5 0 20 inch slots <br /> 21 14 <br /> SANDY SILT(SM) <br /> 23 light gray,moist,no odor <br /> 24 _ groundwater encountered (during drilling) <br /> 25 SM <br /> 18/ 5/26.5 0 16 <br /> 26 18 <br /> 27 <br /> Bor ng terminated at a depth of 27 feet. <br /> 28 Well installed as illustrated. <br /> 29 <br /> 30 <br /> TreallpArelERdlo Project No.2003.02 Figure 4a <br />