S ECOR <br /> • 8.0 PLANNED ACTIVITIES FOR THE SECOND QUARTER 2008 <br /> • Continue groundwater monitoring and sampling in accordance with MRP No. <br /> R5-2004-0820. (Implement new MRP following issuance from the CRWQCB-CVR). <br /> • Continue with quarterly soil vapor point sampling. <br /> • Perform additional SPH removal events and continue with periodic monitoring and <br /> gauging of SPH wells. <br /> • Implement work plan for additional site assessment activities to further define impacts to <br /> deeper groundwater at the Site. <br /> • Continue preparation of the Waterfront Towers Pipeline Removal Report for submittal to <br /> the CRWQCB-CVR. <br /> • Prepare SVE/DPE System Start-Up Report. <br /> 1008QSSRQRSRQMR.Final.doc 34 April 30,2008 <br /> 77TW.26397.42.1307 <br /> �ry <br />