Laserfiche WebLink
' Stantec <br /> ' L & M OPERABLE UNIT-THIRD QUARTER 2010 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> Groundwater Monitoring and Sampling <br /> ' October 27, 2010 <br /> 2.10 REQUESTED CHANGES TO MONITORING AND REPORTING PROGRAM <br /> 1 Based on review of historical and recent groundwater monitoring and sampling data, Stantec <br /> recommended that sampling frequency be reduced for some of the up-gradient and outlying <br /> ' wells for the Site and that some of the analysis currently being performed be eliminated from <br /> select wells. The requested changes were submitted during the third quarter of 2006 and a <br /> meeting to discuss these and an additional change was conducted with the RWQCB-CVR on <br /> ' January 24, 2007. The RWQCB-CVR agreed to provide a revised MRP for the Site. During <br /> recent discussions (second quarter 2009)with the RWQCB-CVR, Stantec was informed that the <br /> RWQCB-CVR was developing a revised MRP for the site. CEMC and COP look forward to <br /> receiving the draft MRP from the RWQCB-CVR for review and future implementation. <br /> ' I\Tidewter, Stoddon(Parcel 2 -0415)\Reports\QMR10101Q1013Q10QSSRQRSRQMR StocktonFINAL.doc 2.27 <br />