Laserfiche WebLink
Spill Prevention Compliance Corporation <br /> Periodic Integrity Test Certificate <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: spccorp , hotmail.com <br /> Client: Chase Chevrolet Contact : Alex Robinson,Service Manager <br /> Address: 6441 Holman Rd. Phone No.: 209-475-6640 <br /> City/State/Zip; Stockton, CA 95212 Date of Test: 10-9-19 <br /> Product Stored: Waste Oil-a UL #: Not Accessible <br /> Tank Information (Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br /> Ace Tanks/294 gals/Waste Oil/UL 142/UL#Not Accessible/Single Wall Steel/25 yrs old(estimated <br /> Description of Secondary Containment Steel Berm (48 in. W X 96 in. L X 30 in. Ht=598gals) <br /> Date of Test 10-9-2019 Test Supervisor(s) Todd McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary XX Secondary XX <br /> 1. Steel Thickness Test(in accordance with API-653 and/or UL 142 Std. (10`x'edition)-Readings Steel <br /> Thickness UL142 min. .093 in./Ava Steel thickness =.109 in. as measured 20 points on each shell <br /> 2. Inert Gas Blanket <br /> Gas Used: Nitrogen ; CO2: ; Other(specify) <br /> Air Pressure-Test Vacuum Test ; <br /> Initial Reading(document psi/WC readings) Time <br /> End Readings (document psi/WC readings) Time <br /> Duration of Test: %drop <br /> 3. Sonar-Test_Y_N (document db readings) Duration <br /> O4. Camera(visual) model Lorex MC81845/interstitial (Result: P/F) Pass <br /> 5. Hydro-Carbon Sensor(probe) model OMNTEC BOA- (Result:_P/F) Pass <br /> 6. Hydrology (Water Column) ( inches of water column readings) <br /> Duration % Drop Results (P/F) <br /> 7. Other: Insl2ect Vessel & secondary containment. AST clearance is 1 inch above berm floor. <br /> Berm sits 2 inches above concrete floor. CRDM is present, no evidence of leaking product from <br /> primary vessel, system accessible for inspection: Small residue in secondary-no evidence of tank leak. <br /> Tank sits in secured enclosure. Upon inspection,no evidence of weld breaks, punctures,cracks,or other <br /> structural damage to the tank. Steel thickness of primary tank and of steel berm measured to.109 in. <br /> average-is in excess of.093 in. steel thickness minimums required under UL 142. : PASS <br /> TEST RESULTS <br /> I"-Stage: <br /> Pass XX Fail(quantify) SENSOR DETECTS PRODUCT ,HOWEVER,DOES NOT APPEAR <br /> AS LEAKS FROM PRIMARY TANK INTO SECONDARY CONTAINMENT-MOST LIKELY <br /> FROM PROCESS OF PRODUCT REMOVAL SPILLAGE INTO BERM <br /> PF-Stage: <br /> Pass XX Fail_(quantify) VISUAL EVIDENCE OF SMALL AMOUNT OF PRODUCT IN THE <br /> SECONDARY- STEEL THICKNESS MEASURED TO BE IN EXCESS OF MINIMUM UNDER <br /> UL 142 STANDARD-NO EVIDENCE OF LEAK FROM PRIMARY VESSEL <br /> Comments section AST is anchored to concrete cinder block wall with steel strap data on file <br /> Next Scheduled Periodic Integrity Test 10-9-24 <br /> LLAI <br /> Pacific Environmental Systems, Representative <br /> STI SP001 Certified Inspector No.: AST 135013 <br />