My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
7750
>
2900 - Site Mitigation Program
>
PR0506227
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2020 2:58:57 PM
Creation date
6/25/2020 12:46:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506227
PE
2951
FACILITY_ID
FA0007289
FACILITY_NAME
HANSON PARCEL
STREET_NUMBER
7750
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
252-040-02
CURRENT_STATUS
02
SITE_LOCATION
7750 SCHULTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY INFORMATION <br /> In the event of an injury or suspected chemical exposure, the first <br /> responsibility of the Project Manager will be to prevent any further <br /> injury. This objective will normally require an immediate stop to work <br /> until the situation is remedied. The Project Manager may order the <br /> evacuation of the work party. Other primary responsibilities in the <br /> event of an accident will be the first aid and decontamination of the <br /> injured team member(s). The injured party will be moved to a <br /> designated safe area and initial first aid will be rendered. <br /> Employees are asked to make every effort and take personnel <br /> responsibility to prevent accidents involving machinery or any other <br /> aspect of the job, either by individual action or by notifying the Project <br /> Manager immediately of any unsafe condition that may exist. <br /> In the event of an unexpected hazardous material discovery on site, the <br /> following actions will be taken by any employee involved; <br /> 1 . The person having uncovered the unexpected material will notify <br /> the Project Manager and other workers of the danger. The site will be <br /> cleared of personnel if deemed necessary by the Project Manager. If <br /> site evacuation is required, appropriate local agencies such as the Fire <br /> Department or Health Department will be notified as well. <br /> 2. Immediate action will be taken to contain the hazardous material, <br /> provided the workers involved are properly attired with adequate <br /> protective clothing to avoid exposure. <br /> 3. Proper containment procedures will be determined for the <br /> hazardous material encountered prior to cleanup commencing. All <br /> personnel involved in the containment effort will be properly protected <br /> to prevent exposure. Backup personnel will be similarly protected <br /> while monitoring the work being done for any additional dangers. <br /> 4. The container(s) will be staged on site, away from the major activity <br /> areas and in such a way that if loss of containment occurs, the material <br /> will be withheld from further spread by a secondary containment berm <br /> or vessel. <br /> 5. The owner or agent controller of the property will be notified <br /> promptly of the incident and will be apprised as to the options available <br /> for proper disposal. <br /> Tracy Health & Safety Plan - June 1998 <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.