My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
7750
>
2900 - Site Mitigation Program
>
PR0506227
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2020 2:58:57 PM
Creation date
6/25/2020 12:46:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506227
PE
2951
FACILITY_ID
FA0007289
FACILITY_NAME
HANSON PARCEL
STREET_NUMBER
7750
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
252-040-02
CURRENT_STATUS
02
SITE_LOCATION
7750 SCHULTE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 4 - ANALYZE THE SOIL SAMPLES <br /> One soil sample from each boring will be analyzed at a CAL-EPA certified <br /> analytical laboratory for total petroleum hydrocarbons as gasoline (TPH-G)- <br /> by modified EPA Method 5030/8015, total petroleum hydrocarbons as <br /> diesel (TPH-D) by modified EPA Method 3510/8015, benzene, toluene, <br /> ethylbenzene and total xylenes (collectively known as BTEX) by EPA <br /> Method 8020, fuel oxygenates by modified EPA Method 8260, and total <br /> lead by EPA Method 6010. <br /> TASK 5 - BACKFILL THE BORINGS WITH NEAT CEMENT <br /> Following collection of the soil samples, the boreholes will be backfilled <br /> with neat cement. <br /> TASK 6 - PREPARE A SUBSURFACE ASSESSMENT REPORT <br /> ASE will submit a report outlining the methods and findings of this <br /> assessment. The report will be submitted under the seal of state <br /> registered civil engineer or geologist. This report will include a summary <br /> of all work completed during this assessment including tabulated <br /> analytical results, conclusions and recommendations. Copies of the <br /> analytical report and chain of custody will be included as appendices. <br /> SCHEDULE <br /> ASE plans to begin field activities at the site immediately following <br /> approval of this workplan by the SJCDPHS. <br /> Should you have any questions or comments, please call us at (925) 820- <br /> 9391 . 20- <br /> 9391 . <br /> Respectfully submitted, <br /> AQUA SCIENCE ENGINEERS, INC. D FOIA <br /> " '���' * NO.6586 <br /> Robert E. KZZ.,R.G., R.E.A. <br /> Senior Geologist OFC <br /> Hanson Property Workplan - June 1998 <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.