Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): Cl 1, <br /> Q 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM, ❑6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): C1'-- <br /> 0 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM, ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C13. <br /> PRIMARY EMERGENCY COORDINATOR NAME: Store Manager PHONE NO.: (209)467-7041 PHONE NO.: (209)485-5327 <br /> ALTERNATE EMERGENCY COORDINATOR NAME: District Manager PHONE NO.: (209)467-7041 PHONE NO.: (818) 798-4270 <br /> a]Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check thea livable boxes to indicate your facility's Procedures for containing spills andreventin and mitigatingreleases,fires and/or explosions. <br /> H] 1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC,; Al. <br /> (32. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e,g.,Portable spill containment walls,built-in berms); <br /> El 3, PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g,,Pads,spill pigs,spill pillows); <br /> [_14. COVER OR BLOCK FLOOR AND/OR STORM DRAINS, <br /> E-15. LINED TRENCH DRAINS AND/OR SUMPS, <br /> 0 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> []8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC 1 ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> E l0.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> [[ l I.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> �] <br /> 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> Q <br /> 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> H1 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑ 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS, <br /> Q 16,HIRE LICENSED HAZARDOUS WASTE CONTRACTOR,, <br /> Q 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e,g„Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑2l.OTHER(Specify): D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): Ei. <br /> ❑ 1. BELLS; e2. <br /> 0 2. HORNS/SIRENS; <br /> ❑3. VERBAL(i.e.,Shouting); <br /> ❑4. OTHER(Specify): <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street corner): e. <br /> Front parking lot <br /> Note;The Emergency Coordinator must account for all onsite em to ees and visitors after evacuation, <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4. <br /> ❑ 1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> Q 2,EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify): E5. <br /> HMBP site map depicts exits and assembly area(s). <br /> Note:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): F1, <br /> ❑ 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> Q 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MARL(Specify): 24-hours corporate contact number to obtain emergency response fl. <br /> services,including emergency response contractors. <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessar},, Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />