My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_20100427 ATC 1Q2010 GWMR COMPLETE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
33 (STATE ROUTE 33)
>
35100
>
2900 - Site Mitigation Program
>
PR0506447
>
ARCHIVED REPORTS_20100427 ATC 1Q2010 GWMR COMPLETE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:59:13 AM
Creation date
6/25/2020 3:37:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
20100427 ATC 1Q2010 GWMR COMPLETE
RECORD_ID
PR0506447
PE
2960
FACILITY_ID
FA0007429
FACILITY_NAME
CROP PRODUCTION SERVICES VERNALIS FACILITY
STREET_NUMBER
35100
Direction
S
STREET_NAME
STATE ROUTE 33
City
VERNALIS
Zip
95385
APN
25518008
CURRENT_STATUS
01
SITE_LOCATION
35100 S HWY 33
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Amy Terrell <br /> April 27,2010 <br /> Page 3 of 10 <br /> GROUNDWATER ELEVATIONS AND GRADIENT <br /> Table 3 summarizes groundwater levels measured during the current and previous sampling events. <br /> Well locations and top of casing (TOC) elevations were surveyed for all Site monitoring wells on <br /> August 31, 2007 as part of the Expanded Pilot Test. TOC elevations are presented in Table 2 and <br /> historical groundwater elevations presented in Table 3 reference. <br /> Groundwater levels beneath the Site in March 2010 ranged from 59.74 to 60.24 feet above mean sea <br /> level (ft MSL). Groundwater elevation contours from the First Quarter 2010 sampling event are <br /> shown on Figure 3. The groundwater flow direction for the First Quarter 2010 groundwater <br /> monitoring event was to the east-northeast with a gradient of 0.0007 foot/foot (ft/ft), which is <br /> consistent with historical trends. Historical groundwater gradient and flow direction is tabulated on <br /> Table 4. <br /> Figure 4 graphically displays groundwater elevation for all monitoring wells at the Site since their <br /> respective installation date. The groundwater elevations typically display seasonal variability with a <br /> generally decreasing groundwater level trend since 1998. Groundwater elevations were observed to <br /> be at an all time low during the March 2010 groundwater monitoring and sampling event. <br /> ANALYTICAL RESULTS <br /> The samples collected during the March 2010 semi-annual groundwater monitoring and sampling <br /> event were analyzed by Southern Petroleum Laboratories, Inc. (SPL), of Houston, Texas. Specific <br /> constituents were subcontracted by SPL to Argon Laboratories of Ceres, California, APPL Lab of <br /> Clovis, California and TestAmerica of Irvine, California. <br /> Analytical results are presented in Tables 5 and 6 and on Figures 5 through 11. The analytical <br /> laboratory report is provided as Attachment 2. Table 5 provides historical data for the past eight <br /> years. Table 6 provides data from the pre-injection baseline monitoring event for the initial pilot <br /> study conducted in June 2002. A complete historical dataset is provided in Attachment 3. <br /> The following discussion of analytical results is organized according to the position of the monitoring <br /> wells relative to the Site: on-Site (MW-2, MW-3, MW-6R and MW-7) and downgradient of the Site <br /> (MW-5). Upgradient monitoring well MW-4 is sampled annually during the third quarter. <br /> On-Site: MW-2, MW-6R,MW-7 and MW-3 <br /> Monitoring wells MW-2, MW-3, MW-6R, and MW-7 are located along the eastern boundary of the <br /> Site (Figure 2). MW-2 and MW-7 are located immediately downgradient of the Expanded Pilot Test <br /> area and MW-6R is located within the Expanded Pilot Test area. The results of the Expanded Pilot <br /> Test performance monitoring are discussed later in this report. The following is a summary of the <br /> analytical results for the 2010 groundwater sampling event. <br />
The URL can be used to link to this page
Your browser does not support the video tag.